Stormwater and drainage plans for Adelaide homes
Where the Planning and Design Code's Stormwater Management Overlay applies, a new home needs a rainwater tank, and on smaller or harder-surfaced sites some detention as well. We prepare drainage plans that size the tanks, route the pipes to the kerb or an easement, and keep water away from footings on reactive clay.
- From $790+ GST ($869 inc GST)
- Under 20 minaverage time to a fixed quote
- 1,000–4,000 Lrainwater tank, by site size
In short
A drainage plan for an Adelaide home starts from $790 + GST ($869 inc GST). Where the Code's Stormwater Management Overlay applies, a new dwelling needs a rainwater tank of 1,000, 2,000 or 4,000 L by site size, plus 1,000 L of detention with a 20–25 mm slow-release orifice on small or low-perviousness sites. Kerb connections need council approval.
- Fee
- From $790 + GST ($869 inc GST)
- You receive
- A drainage plan with tank, detention and pipe sizes
- Approvals
- Council for kerb connections, SA Water for easements
When you need one
When does a home need a drainage plan?
A drainage plan is usually needed when you build a new home, townhouses or a large addition, when the overlay asks for a tank or detention, when you connect to the kerb, or when you build near an SA Water easement. It is the drawing that shows your council or certifier the stormwater rules are met, and the one your plumber builds from.
Stormwater connections, from the roof to the tank and from the tank overflow to the street, are regulated by council under the PDI Act. The plumbing from the tank to your toilet or laundry is regulated by the Office of the Technical Regulator. A good drainage plan keeps the two clear.
- New detached, semi-detached and row dwellings, or fewer than 5 group dwellings, in the overlay
- Detention on small sites or sites with little pervious ground
- A new or changed connection to the kerb
- Building, paving or a tank near an SA Water easement
- A lot below road level that can't drain to the street by gravity
Which approvals does my drainage need?
Is the site in the Stormwater Management Overlay?
Check your address on SAPPA, the state's property and planning atlas.
Yes: tank and maybe detention sized to Table 1No: council's own requirementsDoes the water go to the kerb?
Many suburban house sites drain to the street kerb.
Yes: council approval for the connectionNo: an easement or on-site solutionIs there an SA Water easement on the lot?
The title or easement plan shows it.
Yes: SA Water approval, applied for with council'sNo: no SA Water stepIs the lot below the road?
Water can't reach the kerb by gravity.
Yes: grated drains, a pump or on-site detentionNo: a standard gravity layout
The Code
What does the Stormwater Management Overlay require?
The overlay requires a rainwater tank sized to the site, plumbed into the house, and on some sites extra detention that releases slowly. It covers detached, semi-detached and row dwellings, fewer than 5 group dwellings, co-located housing and flat dwellings, and its aim is to capture and reuse stormwater on site.
- Roof connected: at least 60% of the roof for a detached (not battle-axe), semi-detached or row dwelling; 80% otherwise
- Plumbed in: to a toilet or the laundry cold water outlets on sites under 200 m², and to a toilet and the laundry cold outlets on larger sites
- Detention: a 20–25 mm slow-release orifice where detention is required
- Roof share: the dwelling roof makes up at least 80% of the site's impervious area
The old 1,000 L tank rule no longer applies
Older guides describe a building rule requiring a 1,000 L plumbed rainwater tank. Ministerial Building Standard MBS 007 now says that NCC variation, SA Part H9, does not apply in South Australia. Tank sizes come from the overlay, and the Code changes every fortnight, so we check the current version for each site.
Tank sizes in the Stormwater Management Overlay
| Site area | Retention (rainwater tank) | Detention |
|---|---|---|
| Under 200 m² | 1,000 L | 1,000 L |
| 200–400 m² | 2,000 L | 1,000 L if site perviousness is under 30% |
| Over 400 m² | 4,000 L | 1,000 L if site perviousness is under 35% |
Planning and Design Code, Stormwater Management Overlay, DTS/DPF 1.1 and Table 1 (Code version 2026.19). Where detention is required it drains through a 20–25 mm orifice. Check the current Code before you build.
Minimum rainwater tank retention by site area
Councils
Do kerb connections need council approval?
Yes. Councils control connections to their kerbs and roads, with their own forms and rules. The City of Holdfast Bay is a good example: it approves connections through a section 221 form under the Local Government Act, and the owner is responsible for the pipe through the verge and the kerb outlet.
Holdfast's rules set pipes of 75–100 mm, one outlet per 10 m of frontage (up to two 100 mm pipes side by side), at least 2 m from street trees. Lots below road level need grated drains, pumps or on-site detention. Unley has its own kerb discharge policy with a flow limit per connection, which affects how a larger site is drained. Our drainage plan shows the outlet details your council asks for, on Glenelg, Unley or any other council's form.
SA Water easements: the main clearances
| What you build | SA Water's encroachment rules |
|---|---|
| Anything over a water easement or a sewer access point | Not allowed |
| A house over a sewer easement, not over the main | Footing zone of influence clear of the trench, 1.5 m to the main's centre, concrete in 1.0 m slabs within 0.6 m of the main's centreline, 6.5 m maximum length |
| A shed or carport | 1.0 m clearance if demountable, 1.5 m if masonry; over a main it must be demountable, with 2.4 m openings for access |
| A pool or tank in an easement | Footing zone of influence clear of the sewer trench, 1.5 m from the centre of the main |
From SA Water's encroachment over easement fact sheet, which is undated. Applications go to SA Water at the same time as council; confirm the current rules with SA Water.
What you receive
What's in our drainage plan?
A drawing and short calculations that answer your council's questions and give your plumber a clear layout.
Roof and catchments
Downpipes, the share of roof feeding the tank, and the paved and pervious areas that set the detention rule.
Tank and detention sizing
Retention and detention volumes from the overlay's table, with the orifice size and overflow level.
Pipes, pits and falls
Pipe sizes and grades, pits and grates, and the route to the kerb, an easement or an on-site system.
Kerb outlet details
Outlet number, size and position, set out the way your council's form asks for them.
Footings on reactive clay
Water kept clear of the footings, with pipes and pits placed so a leak can't soak the clay under the house.
Stormwater and drainage plan
For a house on a typical suburban lot. Detention, a pump, a site below road level, an easement or several dwellings add to the work, and the fixed quote says what applies.
What to send for a quote
- Site plan or house plans, with the roof and paved areas
- Block size and the number of dwellings
- Title or easement plan, if there is an SA Water main
- A photo of the street frontage, showing the kerb and any street trees
- Whether the lot falls to or away from the road
Where we work
Which areas do you prepare drainage plans for?
We prepare drainage plans for sites across Greater Adelaide and the Adelaide Hills, and from plans and photos anywhere in South Australia. Local rules differ: Holdfast Bay's kerb-outlet rules around Glenelg, the kerb policy in Unley, sloping sites in the Adelaide Hills, and the clay around Modbury, where research links heave to leaking pipes. See all areas.
Green Adelaide is preparing a guideline on meeting the Code's stormwater requirements. Until it is out, the overlay text and your council's rules are what we design to. Ready to start? Use the form above or the full quote form.
Related services
Often needed alongside a drainage plan

Site classification & footings
AS 2870 site classification and footing or slab design for new homes, extensions and granny flats on Adelaide's reactive clay.
from$1,200+ GST$1,320 inc GSTLearn more
Granny flat engineering
Soil test, slab, footing and frame engineering for a granny flat in your backyard, with drawings and calculations for your certifier.
Fixed quoteLearn more
Retaining walls
Engineered retaining walls for sloping blocks, boundaries and Adelaide Hills sites, with drawings your builder and council can use.
from$790+ GST$869 inc GSTLearn moreFAQ
Stormwater and drainage plan FAQs
Still unsure? Call 08 7083 9853 or send photos for a fixed quote.
What is a drainage plan?
A drainage plan shows how stormwater leaves your roof and paving: downpipes, pipe sizes and falls, pits, rainwater tanks, any detention and where it all discharges. Your council or certifier uses it to check the Code's stormwater requirements, and your plumber builds from it.
How big does my rainwater tank need to be in Adelaide?
Where the Stormwater Management Overlay applies, it depends on site size: 1,000 L under 200 m², 2,000 L for 200–400 m² and 4,000 L above that. Sites under 200 m², and larger sites with little pervious ground, also need 1,000 L of detention.
Is there still a rule for a 1,000 L tank on every new home?
No. That older building rule came from an NCC variation, SA Part H9, and Ministerial Building Standard MBS 007 now says it does not apply in South Australia. Tank requirements for houses come from the Code's Stormwater Management Overlay instead.
Do I need council approval to connect stormwater to the kerb?
Yes. Kerb connections need council approval, usually on the council's own form. Holdfast Bay, for example, uses a section 221 form, and the owner is responsible for the pipe through the verge and the kerb outlet.
Can I build over an SA Water easement?
Not over a water easement or a sewer access point. A house may sit over a sewer easement, but not over the main, with SA Water's approval: its fact sheet asks for 1.5 m clearance to the main's centre and the footing zone of influence kept clear of the trench. Check the current rules with SA Water.
How much does a stormwater plan cost in Adelaide?
Our drainage plans start from $790 + GST ($869 inc GST) for a house. Detention, a pump, a site below road level or an easement add to the work, and you get a fixed quote in under 20 minutes on average, during business hours.
Why does stormwater matter for my footings?
Much of Adelaide sits on highly reactive clay, which swells when it gets wet. A study at Modbury North found the clays react to ponding and leaking service pipes, so keeping water away from the footings is part of keeping a house stable.
Do you install stormwater pipes or tanks?
No. We design and document the drainage, and a licensed plumber builds it. We are engineering only, so we never sell, install or recommend a contractor.