Elevated view across flat suburban rooftops and trees to the long ridge of the Adelaide Hills

City of Salisbury · South Australia

Structural engineer in Salisbury

Retaining walls with a fence on top, backyard pools, granny flats and verandahs in Salisbury, Salisbury East, Mawson Lakes and Paralowie. We prepare the footing calculations and connection details the City of Salisbury asks for, and engineer the rest of the backyard to match.

  • 2.1 mwall plus fence, from the low side
  • Under 20 minaverage time to a fixed quote
  • From $790+ GST for retaining wall design
Quote requestMon–Fri 8am–5pm

Get a Salisbury quote

Tell us the wall height and the fence you plan to put on top, or send photos and plans.

We reply with a fixed quote in under 20 minutes on average, during business hours.

Engineering only
Fixed prices from $350 + GST
Quotes in under 20 min on average
NCC & Australian Standards

In short

In Salisbury, a retaining wall with a fence on top needs development approval once the two together exceed 2.1 m, measured from the lower ground. The City of Salisbury then asks for the engineer's design, including calculations for the footings and connection details. We design these walls from $790 + GST ($869 inc GST), and engineer pools, granny flats and verandahs across Salisbury, Mawson Lakes and Paralowie.

Structural engineer Salisbury: local facts

Council
City of Salisbury
Wall plus fence
Approval once the combined height exceeds 2.1 m, measured from the lowest side of the ground
What council asks for
A site plan, elevations, construction details and the engineer's footing calculations and connection details
Pool applications
Plans show the setbacks from the boundaries, the safety features and where the pump goes; council inspects once the pool is in
Corner blocks
A fence over 1 m within 6 m of a road intersection needs approval, unless a 4 m × 4 m corner cut-off is provided

Wall plus fence over 2.1 m: what does Salisbury require?

Development approval, once the retaining wall and the fence on it add up to more than 2.1 m, measured from the lowest side of the ground. A fence alone is exempt up to 2.1 m, and a wall alone is exempt while it retains no more than 1 m. The City of Salisbury's own page says an application is needed once a wall is 1 m or greater, so treat a wall right on 1 m as needing one.

The combined rule catches ordinary jobs. A 1.8 m Colorbond fence is exempt on level ground, but put it on a 600 mm wall and the total from the low side is 2.4 m.

Retaining wallFence on topHeight from the low sideApproval on height?
300 mm1.8 m2.1 mNo, it doesn't exceed 2.1 m
600 mm1.8 m2.4 mYes, with the engineer's footing calculations
900 mm1.5 m2.4 mYes
1.2 mNone1.2 mYes: the wall retains more than 1 m

Illustrative examples. Other triggers apply too: masonry fences over 1 m, fences over 1 m within 6 m of a road intersection, pool safety fences and land in a flood overlay. Source: the City of Salisbury fencing page and PDI Regulations Schedule 4.

Council wants the engineer's design because the fence changes how the wall behaves. Wind on a solid fence pushes on its posts, and when those posts sit in or just behind the wall, the wall and its footing have to resist that push as well as the soil. Our design gives the post footings, the wall section and the connection between them, ready to lodge with the site plan and elevations through PlanSA. Retaining wall design starts at $790 + GST ($869 inc GST).

Who pays for a retaining wall between Salisbury neighbours?

The owner who altered the natural lie of the land is responsible for the wall, and if both neighbours cut or filled, they are jointly responsible. Council's guidance treats the cost split as a civil matter between neighbours and says it has no authority in boundary disputes.

Where the wall sits follows the same logic. If only one owner needs a wall on the boundary, it goes wholly on that owner's side with only its outside face on the line. If both share it equally, it can straddle the boundary. A design that shows how much ground each side retains makes that conversation easier. The retaining wall rules guide covers the state-wide picture, including how tiered walls are measured.

What does a pool approval in Salisbury involve?

Planning and building approval for any pool deeper than 300 mm or fitted with a filter, including inflatable ones, with plans showing the setbacks from your boundaries, the pool's size and safety features, and the location of the pump and other equipment. The state's pool guidance says council checks the barrier, pump safety and the adequacy of the structural support.

That last point is the engineer's part. A shell near a boundary, a fence footing or the house needs a design that suits the soil and the loads around it, and a dig close to the boundary may require a section 139 notice to your neighbour. The safety barrier must be finished within two months of the pool being completed or before it is filled, whichever comes first, and you notify council for an inspection once everything is in. Pool engineering starts at $890 + GST ($979 inc GST).

Selling a home with a pool approved or built before 1 July 1993? Its barrier must meet Ministerial Building Standard MBS 004 by settlement, as the City of Salisbury's pool page explains. That's a barrier upgrade rather than a structural one, but a cracked shell or a leaning wall beside it is worth a structural inspection.

Granny flat or verandah in Salisbury: is an engineer needed?

Usually, yes. A granny flat needs a site classification and a footing or slab design, and a roofed verandah or carport usually needs member sizes and footing details for its approval.

Under the Code's urban design standard, ancillary accommodation of up to 70 m², with walls up to 3 m and a roof up to 5 m high, meets the deemed-to-satisfy criteria, but your zone decides what's allowed, so check it first (the granny flat rules guide explains). Much of Adelaide sits on highly reactive clay and every site needs its own classification, so the soil test is arranged as part of granny flat engineering, priced as a fixed quote.

An open pergola is exempt if it has no solid roof, open sides, is no higher than 4 m and doesn't sit in front of the building line. Add a solid roof and that exemption no longer applies. Verandah, carport and deck engineering starts at $490 + GST ($539 inc GST), and an engineer's certificate for a structure that's already built starts at $390 + GST ($429 inc GST).

Service area

Suburbs we cover around Salisbury

We visit homes and building sites across the City of Salisbury. Further north, see structural engineer Elizabeth for Playford; to the east, Modbury for Tea Tree Gully.

  • Salisbury
  • Salisbury East
  • Mawson Lakes
  • Paralowie

Not sure we cover your street? Send the address and we'll confirm it in your fixed quote. Site visits across Greater Adelaide and the Adelaide Hills. Desktop reviews of photos and plans anywhere in South Australia.

Other areas

All areas we cover

FAQ

Structural engineer Salisbury: FAQs

Still unsure? Call 08 7083 9853 or send photos for a fixed quote.

Do I need approval for a fence on top of my retaining wall in Salisbury?

Yes, if the wall and fence together are more than 2.1 m above the lowest side of the ground. The City of Salisbury asks for the engineer's design with footing calculations and connection details, which we prepare from $790 + GST ($869 inc GST).

What will engineering for my Salisbury backyard cost?

Verandah, carport and deck engineering starts at $490 + GST, retaining walls at $790 + GST, pool engineering at $890 + GST and a structural inspection at $990 + GST. Granny flats are a fixed quote, and every job is priced before we start.

Does an in-ground pool in Salisbury need an engineer?

Usually. The approval looks at the adequacy of the pool's structural support, so the shell needs a design for your soil and anything close by, such as a boundary, a fence or the house. Pool engineering starts at $890 + GST ($979 inc GST).

I'm selling a Salisbury East house with an old pool. What do I need?

If the pool was approved or built before 1 July 1993, its safety barrier must meet Ministerial Building Standard MBS 004 by settlement; no inspection is required at sale. If the shell or a nearby wall is cracked, a structural inspection tells you whether it's structural.

My neighbour and I both need a retaining wall. Who pays?

The owner who changed the natural ground level is responsible, and if you both cut or filled, you share it. Council doesn't decide the split: it's a civil matter, and the Legal Services Commission can advise.

Do you visit Mawson Lakes and Paralowie?

Yes. We visit Salisbury, Salisbury East, Mawson Lakes, Paralowie and the rest of the council area, and review photos and plans for desktop jobs anywhere in South Australia.