Builders · Building designers · Certifiers

A structural engineer for Adelaide builders and designers

Footing, slab and beam design, retaining walls, stormwater plans, engineer's certificates and independent certification of structural calculations. Upload the plans and get a fixed fee in under 20 minutes on average, during business hours.

Footing plan and steel beam plan drawings with a scale ruler, pen and a signed certificate on a desk, with a city view through the window

In short

Builders, building designers and certifiers in Adelaide use us for the structural part of a job: footing and slab design, beams, retaining walls, stormwater plans, engineer's certificates and independent certification of calculations for Building Level 2 and 3 accredited professionals. Upload PDF plans for a fixed fee in under 20 minutes on average, during business hours. The quote states what's included and whether a site visit is needed.

Quote
Fixed fee in under 20 minutes on average, during business hours
Fees
Beam design from $790 + GST ($869 inc GST), certificates from $390 + GST ($429 inc GST)
Paperwork
Drawings, calculations, certificates and independent certification
Site visits
Greater Adelaide and the Adelaide Hills; desktop work anywhere in South Australia

What we engineer

What can a structural engineer do for builders and designers?

A structural engineer designs the parts of your job that the council or certifier needs engineered, and certifies work that's already built. These are the jobs builders and designers most often send us, with starting prices ex GST and the inc GST figure beside them.

Independent certification

What is independent certification of structural calculations?

It's a second engineer's check of the structural calculations, which a Building Level 2 or Level 3 accredited professional needs before granting building consent (PDI Regulations, reg 25(5)). The person who certifies must be an independent technical expert.

Who grants Building Rules ConsentWhat they can approveCalculations independently certified?
CouncilBuilding work in its area, on the advice of a suitably accredited professionalNot a reg 25 requirement; the council says what it needs
Building Level 1Any class of buildingNot a reg 25 requirement
Building Level 2Buildings up to 3 storeys and 2,000 m²Yes
Building Level 3Class 1 and 10 buildings up to 2 storeys and 500 m²Yes
Building Level 4Cannot grant building consentNot applicable

Who counts as independent?

  • Not the building owner, or an employee of the owner
  • Not involved in any aspect of the development, beyond general preliminary advice
  • No direct or indirect financial interest in the development
  • Engineering qualifications the certifier accepts

So we can certify calculations by another engineer or designer, and a design of ours goes to a different engineer for this check. Houses and Class 10 work start from $390 + GST ($429 inc GST); commercial certification is by fixed quote.

SA paperwork

What does an SA building consent need from the engineer?

A building consent application on PlanSA needs footing and structural drawings, calculations or reports, and written details of any foundation investigation (PDI Regulations, Schedule 8). At completion, the consent lists any certificates or reports to lodge with the Statement of Compliance.

DocumentWhenWho provides it
Footing and structural drawings (1:200)With the building consent applicationEngineer
Calculations or reportsWith the application; independently certified for Level 2 and 3Engineer, plus the independent technical expert
Foundation investigation detailsWith the applicationSite classification or geotechnical report
Site plan (1:500) with easements and regulated trees, including those on adjoining landWith the applicationDesigner, with our input on trees and easements
Stage notifications1 business day before work starts, at the stages the council sets, and before completionBuilder
Certificates or reports listed on the consent (reg 57(8)(c))At completionEngineer, after the stage inspections
Statement of ComplianceAt completionBuilder signs Part A, owner Part B

Current policy is for councils to inspect 66% of new houses, 90% of new commercial buildings and 100% of new pools. More in the guide to building approvals in SA.

01

Reactive clay

Much of Adelaide sits on highly reactive clay, and every site needs its own classification. Footings are designed for the site class, never an assumed one.

02

Boundaries

Excavation near a boundary can trigger a section 139 notice at least 20 business days before work, and the neighbour can bring in their own engineer.

03

Walls and fences

Retaining over 1 m, or wall plus fence over 2.1 m from the low side, needs approval. Councils such as Salisbury ask for the engineer's footing calculations.

04

Code editions

NCC 2022 (as amended) applies until 30 April 2027 and NCC 2025 from 1 May 2027, when pool barriers move to AS 1926.1:2024.

Sending plans

How do you send plans for a quote?

Upload the plans through the quote form as PDFs, with the item you need engineered marked up. The form takes up to 5 files of 50 MB each, as PDF, Word, JPG or PNG. For CAD files or larger sets, email them to info@adelaidestructures.com.au with the job address.

  • The architectural set: site plan, floor plans, elevations and sections
  • The item to engineer, circled or noted: a beam, a wall, the footings, the whole frame
  • The site address, so we can check overlays, easements, trees and the coast
  • The soil report or site classification, if there is one
  • Photos for work on an existing building
  • The certifier's request, and their accreditation level if you know it
  • Your program: lodgement date, start date or the next pour

Regular and repeat work

Sending similar jobs often, such as one house design on different blocks or one verandah range on many sites? Say so when you send the first one. Each job still gets its own fixed quote, and we can quote a set of similar jobs together.

What happens next

  1. Fixed quote

    In under 20 minutes on average, during business hours: the scope, whether a site visit is needed and what you'll receive.

  2. Design and drawings

    Calculations and structural drawings marked up for the builder, with questions answered as the job goes.

  3. Documents for the certifier

    Ready for the building consent on PlanSA, with answers to the certifier's questions on our design.

  4. Inspections and sign-off

    Stage inspections across Greater Adelaide and the Adelaide Hills as listed in the quote, then the certificates the consent asks for.

Independent

Why use an independent engineer?

We only design, inspect and certify, so there's no build or repair to sell and no reason to over-design. Our drawings are written for any licensed builder to follow.

FAQ

Builder, designer and certifier FAQs

Still unsure? Call 08 7083 9853 or send photos for a fixed quote.

Can you certify another engineer's calculations as the independent technical expert?

Yes, as long as we weren't involved in the development and have no financial interest in it (PDI Regulations, reg 25(7)). For a house or Class 10 structure it starts from $390 + GST ($429 inc GST); commercial projects are priced by fixed quote.

If you design the structure, who certifies it for a Level 2 or 3 certifier?

Another engineer. Because we were involved in the design, we can't also be its independent technical expert. Tell us the certifier's level when you ask for a quote, so the second check can be planned into your program.

What do you need for a footing design?

The plans, the site address and the site classification or soil report if there is one. If there isn't, site classification is arranged as part of the job, and the quote says so.

How do I send plans?

Through the quote form: up to 5 files of 50 MB each, as PDF, Word, JPG or PNG. For CAD files or larger sets, email info@adelaidestructures.com.au with the job address.

Do you sign the Statement of Compliance?

No. The licensed building work contractor signs Part A and the owner signs Part B. We supply the engineering certificates or reports the consent lists, which are lodged with it.

Do you answer the certifier's questions about your design?

Yes. If the council or certifier asks about our calculations or drawings, we answer them, and if a change is needed we update the design and the documents.

Do you compete with builders or recommend contractors?

No. We are engineering only: we design, inspect and certify. We never build, sell repairs or recommend a contractor, so we're never pricing against you.