In short

Working with Adelaide Structures takes four steps. Send photos or plans through the quote form, get a fixed quote in under 20 minutes on average, during business hours, have a site visit if your quote says the job needs one, then receive a report, design or certificate by the date in your quote. Site visits cover Greater Adelaide and the Adelaide Hills; desktop work covers all of South Australia.

To quote
Photos or plans are usually enough
Your quote
Fixed, in under 20 min on average (Mon–Fri 8am–5pm)
You receive
A report, design or certificate

The process

What are the steps?

There are four steps from your first message to the finished report, design or certificate, and the second one fixes the price before any work starts.

  1. Step 1 · Any time

    Send photos or plans

    Use the quote form: your name, phone, email, the suburb of the property, the service and a short description. Attach up to 5 photos, plans, earlier reports or a contractor's quote, 50 MB each. Mention any deadline, such as settlement, a council date or a builder's start date.

  2. Step 2 · Under 20 min on average

    Get a fixed quote

    An engineer reads your request and replies, during business hours (Mon–Fri 8:00am–5:00pm), with a fixed fee shown ex GST and inc GST, what's included and whether the job needs a site visit. There's no obligation to go ahead.

  3. Step 3 · If the job needs it

    Site visit

    For structural inspections, crack reports, salt damp assessments and dilapidation reports, the engineer visits the property, measures and photographs. Outside Greater Adelaide and the Adelaide Hills, we work from photos and plans.

  4. Step 4 · By the date in your quote

    Report, design or certificate

    A report, drawings and calculations, or a certificate. Questions about it? Call or email and we'll talk it through.

Camera on a tripod in front of the rendered side wall of an older house, with a construction fence and a deep excavation next door and a clipboard on the step
Figure 1On a site visit the engineer records what is there before judging it: photos, crack widths and levels, so a later visit can show whether anything has changed.

Desktop jobs, anywhere in South Australia

A desktop review of photos or plans starts at $350 + GST ($385 inc GST), with no visit. An underpinning quote second opinion is done the same way, from the contractor's quote, any reports and your photos.

Before you send

What should I send for my job?

Send whatever lets an engineer see the problem or the project: photos, plans, measurements and any reports or quotes you already have. This table shows what helps most for each kind of job.

JobSend thisHelps if you have it
Cracks, sloping floors, sticking doorsPhotos of each crack close up, with a coin or ruler for scale, and from further back. When you first noticed themRecent plumbing leaks, trees near the house, earlier reports
Pre-purchase inspectionThe address, what worries you and the building inspector's report if you have oneYour cooling-off or settlement date
Underpinning second opinionThe contractor's quote and scope, plus photos of the cracksAny engineer's or soil report the quote relies on
Salt damp damagePhotos of the wall base inside and out, and of any cracks above itA damp contractor's quote or report, if you have one
Wall removalPhotos of the wall from both sides and a floor plan with the wall markedPhotos of the roof space above it, and the roof type
Retaining wallPhotos of the slope, the height and length you need, and the distance to the boundary and buildingsWhat sits above the wall (driveway, house, pool), and whether a fence will go on top
Verandah, pergola, carport or deckA sketch or plan with sizes, the height above the ground, roofed or open, attached or freestandingPhotos of where it meets the house
Swimming poolA site plan with the pool position, its size and type, and photos of the slopeDistances to the house, boundaries, trees and any SA Water easement
Stormwater and drainageA site plan with roof and paved areas, and the council's conditionsThe site area and where water can leave the site
Extension or granny flatArchitectural or building design drawingsA site classification report and any existing structural drawings
Engineer's certificateWhat was built and when, the approved plans and what your certifier or council asked forPhotos taken during construction, before the work was covered up
Bluestone or heritage homePhotos of the walls, cracks and any decayed stone or mortarWhether the house is in a Historic Area or is a heritage place
Commercial projectArchitectural drawings and the certifier's requirementsExisting structural drawings, plant, racking or solar loads

Not sure what to send? Photos and a short description are enough to start. We'll ask if we need anything else.

Site visit or desktop

Which jobs need a site visit?

Jobs that judge the condition of a building need an engineer on site; jobs that check documents or design from plans usually don't. Your quote always says which.

Usually from photos and plans

Desktop work, SA-wide

From $350 + GST ($385 inc GST) for a desktop review.

Ask for a desktop review →

Need a site visit

Greater Adelaide & the Hills

From $550 + GST ($605 inc GST) for a site inspection with a letter of advice.

Areas we visit →

After we deliver

What happens after I receive the design or report?

A report tells you what to do next; a design goes into your approval. For building work in South Australia, the path from our drawings to a finished job usually looks like this.

  1. Apply on PlanSA

    Your designer or builder lodges the application with our drawings and calculations. Planning Consent, where the Code needs it, and Building Rules Consent together make up Development Approval.

  2. Building Rules Consent

    Granted by the council or an accredited professional (Building Level 1–3). A Level 2 or Level 3 certifier needs the structural calculations certified by an independent technical expert.

  3. Build and inspect

    The builder gives the council notice before work starts and before any stage the consent names. Stage inspections by us happen only where your quote lists them.

  4. Statement of Compliance

    At completion the builder signs Part A and the owner Part B. We supply any engineer's certificates or reports your consent lists to go with it.

Not every job needs approval

Some minor work is exempt when it meets set conditions, such as a retaining wall holding back no more than 1 m of ground (not within 100 m of the coast, in a flood overlay or at a heritage place). Removing a load-bearing wall needs approval. Read building approvals in SA, or check the rules on PlanSA.

Your files

What happens with the files I send?

Your files are used to quote and carry out your job. They are not sold or used for marketing.

  • Uploaded through our form service. Files you add to the quote form upload to Web3Forms as you add them, and reach us as links with your request.
  • Used for your quote and your job. We use them to price the work and, if you go ahead, to prepare your report or design.
  • Shared only as your job needs. For example with your certifier, builder or designer, or where the law requires it.
  • Kept as professional records. Reports, drawings and photos may be needed later, for example to compare a crack over time.

More detail is in our privacy policy.

Large or many files

More than 5 files, or over 50 MB?

Attach the most useful ones to the form, then email the rest, or a download link, to info@adelaidestructures.com.au with your name and suburb so we can match them to your request.

Timing

How long does it take?

Your fixed quote arrives in under 20 minutes on average, during business hours, and the quote sets the delivery date for your report or design. Every job is different, so the date is in your quote rather than on this website.

StageWhen
Your fixed quoteUnder 20 min on average, Mon–Fri 8:00am–5:00pm. Requests sent after hours are quoted on the next business day.
Site visitArranged with you once you accept the quote, if the job needs one.
Report, design or certificateBy the delivery date in your quote. It depends on the scope, any site visit and the information available.
Your deadlineTell us the date (cooling-off, settlement, council or a builder's start). Your quote confirms whether it can be met.

Fees

How does payment work?

Payment terms are in your quote. Our website prices are starting prices in Australian dollars, shown ex GST with the inc GST figure beside them, from $350 + GST ($385 inc GST).

The fee is fixed for the scope in the quote. If you later want something outside it, such as a repair design after a report, we quote that separately before we start.

See all prices

Not sure which service you need?

Choose "Not sure, please advise" on the quote form and describe what's happening. We'll tell you what the job needs.

FAQ

How it works: FAQs

Still unsure? Call 08 7083 9853 or send photos for a fixed quote.

Can you quote from photos alone?

Yes. Photos or plans are enough for a fixed quote on most jobs. If we need one more photo or measurement to price it, we ask before we quote.

What if I send my request after hours?

Quotes are prepared Mon–Fri 8:00am–5:00pm. A request sent in the evening or at the weekend is quoted on the next business day.

Do you always need to visit the site?

No. Your quote says whether the job needs a visit. Inspections, crack reports and dilapidation reports do, while an underpinning quote second opinion (from $350 + GST) and many designs and certificates are done from documents and photos.

Can you meet my settlement or council deadline?

Tell us the date when you send your request. Your quote gives the delivery date, so you know whether it works before you book.

How do I pay?

Payment terms are in your quote. Website prices are starting prices in Australian dollars, shown ex GST with the inc GST figure beside them.

What if I have more than five files?

The form takes up to 5 files of 50 MB each. Attach the most useful ones, then email the rest, or a download link, to info@adelaidestructures.com.au with your name and suburb.