Tree-lined inner-suburb street of single-fronted bluestone and sandstone villas with bullnose verandahs and parked cars

Home buyers · Investors

Pre-purchase structural inspection for Adelaide buyers

When a building inspection report says "refer to a structural engineer", you need an answer before your cooling-off period or inspection condition runs out. An independent engineer inspects the structure, explains the cause and severity of the cracks or movement, and sets out what a repair would involve, so you can proceed, renegotiate or walk away.

  • From $990+ GST ($1,089 inc GST), report included
  • Under 20 minaverage time to a fixed quote
  • Your deadlinethe quote confirms the report date
Quote requestMon–Fri 8am–5pm

Get a fixed quote before your deadline

Send the address, the building inspection report if you have one, and your cooling-off or inspection deadline.

We reply with a fixed quote in under 20 minutes on average, during business hours.

Engineering only
Pre-purchase from $990 + GST
Quotes in under 20 min on average
NCC & Australian Standards

In short

A pre-purchase structural inspection is an engineer's check of a house you plan to buy, usually after a building inspection flags cracks, movement or alterations. In Adelaide it starts from $990 + GST ($1,089 inc GST). South Australia's cooling-off period is short, usually ending two clear business days after the Form 1 is served, and there is none at auction, so book early and confirm dates with your conveyancer.

Fee
From $990 + GST ($1,089 inc GST)
Timing
Fixed quote in under 20 min on average, with the report date
You receive
The cause, how serious it is and the likely repair scope

Building inspection vs structural

How is it different from a building inspection?

A building inspection surveys the whole property for defects. A pre-purchase structural inspection is an engineer's assessment of the structure only: why it has moved, whether it is still moving and what a fix would involve. The building inspection comes first; the structural inspection answers the questions it raises about the structure.

CompareBuilding inspectionPre-purchase structural inspection
Done byA building inspectorA structural engineer
CoversThe whole property: roof, walls, wet areas, defects, often timber pestsThe structure: footings, walls, floors, framing, retaining walls and the site
Cracks and movementRecorded, often with "refer to a structural engineer"Measured, rated against AS 2870 and traced to a cause
AnswersWhat defects does the property have?Why is it moving, is it getting worse and what would a fix involve?
Book itFor most purchasesWhen the inspection flags structural concerns, or for an older stone home or a sloping block

The two work together: the building inspector covers the whole house, the engineer covers the structure. More in building inspector or structural engineer before you buy?

Inspector flagged something?

What should you do when the inspector flags a structural issue?

Send us the building inspection report with the address and your deadline. You'll have a fixed quote in under 20 minutes on average, during business hours, and the quote says whether we can report before that date.

Phrases in a building report that need an engineer

  • "Evidence of movement" or "cracking to masonry": the footings may have moved, and the cause matters more than the crack.
  • "Floors out of level": a slab or footing has moved, or the stumps under a timber floor have.
  • "Retaining wall leaning": a wall retaining more than 1 m of ground is development and needs approval to rebuild.
  • "Wall removed" or "alterations noted": has a load path changed? Removing a load-bearing wall needs approval, so ask for the records.
  • "Salt damp" or "fretting masonry": usually a damp specialist's job, unless the decay affects the wall's stability. See the structural side of salt damp.
  • "Major defect" or "refer to a structural engineer": the inspector has reached the limit of what a building inspection can answer.
  1. Send the report and your deadline

    Upload the building inspection report, listing photos if you have them, and the date your cooling-off period or inspection condition ends.

  2. Fixed quote in under 20 min on average

    During business hours (Mon–Fri 8:00am–5:00pm). The quote states the fee, the inspection date and the report date.

  3. Inspection and report

    The engineer inspects with the agent's access and reports on the cause, how serious it is and the likely repair scope.

Timing

How does a structural inspection fit the settlement timeline?

It fits between the building inspection and the end of your cooling-off period or inspection condition, which in South Australia can be a matter of days, so the engineer needs to be booked as soon as the building report raises a question.

  1. Offer accepted

    Contract signed, Form 1 served

    The vendor's statement starts the clock. The cooling-off period usually ends two clear business days after it is served. There is none at auction.

  2. Straight away

    Building inspection

    Book it early. If your contract has a building inspection condition, its date is the one that counts.

  3. If something is flagged

    Structural inspection

    Send us the report and the deadline. The fixed quote confirms we can report before it.

  4. Before the deadline

    Decide

    Proceed, renegotiate or withdraw, with your conveyancer's advice.

  5. Settlement

    The house is yours

    Repairs, approvals and any further reports are now your decisions.

Cooling-off in South Australia

The cooling-off period expires at the end of the second clear business day after the Form 1 is served; weekends, public holidays and the day of service don't count. There is no cooling-off at auction, and a buyer can waive it with a solicitor's certificate. Source: Law Handbook SA. We can't give legal advice: your conveyancer confirms your dates.

Not structural, but due before settlement

A pool built before 1 July 1993 must meet the safety standard MBS 004 before settlement on sale. That is a pool safety matter for the vendor and your conveyancer, not part of our report.

Do

  • Book the building inspection the day the offer is accepted
  • Send us the deadline with your quote request
  • Ask the agent about roof space and subfloor access

Don't

  • Bid at auction before the structure has been checked
  • Waive cooling-off without advice
  • Rely on a repair quote from someone selling the repair

What we check

What does the engineer check before you buy?

The engineer checks the structure of the house and the ground it sits on, with extra care for the problems that are expensive to fix in Adelaide homes. Much of Adelaide sits on highly reactive clay; every site needs its own classification.

  • Cracks in bluestone, sandstone, double brick and brick veneer, measured and rated against AS 2870
  • Floor levels, doors and windows, and the subfloor of timber floors where it can be reached safely
  • Removed walls, new openings and extensions that may have changed how loads are carried
  • Retaining walls, decks and verandahs, especially on sloping blocks
  • Drainage, leaks and trees close to the footings; a regulated eucalypt still needs approval to remove, even within 3 m of the house
  • Salt damp damage at the base of walls, and whether it is structural
  • Signs of earlier repairs, such as patched cracks or underpinning, and what they suggest

We inspect for buyers across Greater Adelaide, from Norwood, Unley and Burnside to Glenelg, Gawler and the Adelaide Hills.

Printed engineer's report with photo pages, a crack-width gauge card, glasses, a red pen and a laptop showing a floor plan
Figure 1A pre-purchase report is written for a buyer with a deadline: what was found, why it happened and what a fix would involve.

The report

What will the pre-purchase report tell you?

The report tells you what is wrong with the structure, why, and what kind of work would fix it, in plain English you can take to your conveyancer.

The likely cause

Reactive clay, a leak, a tree, a removed wall or a slope, based on what was seen on site.

How serious it is

Each crack rated against the AS 2870 damage categories, and whether the movement looks active.

The likely repair scope

Drainage work, a new beam, underpinning or a rebuilt wall, described so builders can price it.

Approvals to expect

For example, underpinning usually needs building consent, and removing a load-bearing wall needs approval.

Further checks

Anything the visit couldn't confirm, such as a plumbing leak test or a site classification.

Independent

No stake in the sale and no repair to sell, so the scope isn't inflated to win work.

Short on time? Upload the building inspection report now. The quote, in under 20 minutes on average, during business hours, tells you whether we can report before your deadline.

Send the inspector's report

FAQ

Pre-purchase inspection FAQs

Still unsure? Call 08 7083 9853 or send photos for a fixed quote.

How much does a pre-purchase structural inspection cost in Adelaide?

From $990 + GST ($1,089 inc GST), including the report. The fixed quote confirms the inspection date and when the report will be ready, so you can check it against your deadline.

Do I need a building inspector or a structural engineer before I buy?

Usually a building inspector first, for the whole property. Add a structural engineer when that report flags cracks, movement, sloping floors, leaning retaining walls or removed walls. See building inspector or structural engineer.

How long is the cooling-off period in South Australia?

It usually ends at the end of the second clear business day after the Form 1 vendor's statement is served, not counting weekends or public holidays. There is none at auction, and it can be waived with a solicitor's certificate. Your conveyancer can confirm your dates.

Can you inspect before an auction?

Yes, if the agent can arrange access. There is no cooling-off period at auction, so the structure needs to be checked before you bid.

Does the report include repair costs?

No. It sets out the likely repair scope, such as drainage work, a new beam or underpinning, so builders can price it. We don't price building work or recommend contractors.

Can you review the building inspector's report without a visit?

Often, as a first step. A desktop review starts at $350 + GST ($385 inc GST), and the quote says whether your question can be answered from the documents or needs a site visit.

Can I use the report to renegotiate?

The report is yours to use. Buyers often share the likely repair scope with their conveyancer or the agent when deciding whether to proceed, renegotiate or withdraw.