In short
On the slopes of Blackwood, Belair and Eden Hills, most structural engineering is about building into the hill: retaining walls, decks, pools and extensions on steep blocks. The City of Mitcham deems a medium bushfire prone area to have a BAL of 12.5 and refers only high bushfire prone areas to the CFS, which shapes the design. Retaining wall engineering starts from $790 + GST ($869 inc GST).
Structural engineer Blackwood: local facts
- Council
- City of Mitcham
- Bushfire
- Medium bushfire prone areas are deemed BAL 12.5; only high bushfire prone areas need CFS referral
- Belair Village
- Historic Area Statement for an 1880–1900 railway township: sandstone or limestone with red-brick quoins
- Historic Areas
- 4 Historic Area Statements in the City of Mitcham
- Gum trees
- Eucalypts are never covered by the 3 m exemption for trees near a house or in-ground pool
Is your Blackwood block medium or high bushfire prone, and why does it matter?
It decides whether your project goes to the CFS and what bushfire level the construction starts from, so it's the first thing to check. Under the City of Mitcham's bushfire attack level guidance, a medium bushfire prone area is deemed to have a BAL of 12.5, and CFS referral is needed only in high bushfire prone areas.
BAL assessment isn't part of our service: where a site needs one, it comes from a bushfire practitioner, and our designs for decks, verandahs, framing and walls follow the level in their report. Your property's overlays show on SAPPA, or council can confirm them.
Is the site in a high bushfire prone area?
Check the property's bushfire overlay first.
Yes: CFS referral, and a bushfire practitioner sets the BALNo: go to the next questionIs it in a medium bushfire prone area?
Mitcham's guidance covers this case directly.
Yes: deemed BAL 12.5, no CFS referralNo: standard construction rulesIs a new deck in a bushfire prone area or the Historic Area Overlay?
The usual deck exemption doesn't apply in either.
Yes: approval and an engineer's design, even for a low deckNo: exempt only if no higher than 500 mm and at least 900 mm from a boundary
What does building on a Blackwood slope involve?
Footings that step down or reach deeper ground, retaining walls that can quickly pass the 1 m approval line, and drainage that stops water from the high side running under the house.
On a slope, a deck built level with the floor can end up well over 500 mm above the ground at its outer edge, so it loses the deck exemption even outside bushfire areas. A pool shell cut into the hill acts partly as a retaining wall on its high side, and if the excavation comes close to a boundary, section 139 may require notice to the neighbour 20 business days ahead. See deck and verandah engineering, from $490 + GST ($539 inc GST), retaining walls, from $790 + GST ($869 inc GST), and pool engineering, from $890 + GST ($979 inc GST).
A lower-floor addition dug into the hill brings retaining and drainage into one design. Extensions and renovations are priced per project, and the building approvals guide explains Planning Consent and Building Rules Consent.
Can a gum tree that's cracking the house be removed?
Possibly, but check first, because eucalypts are excluded from the exemption that covers most trees within 3 m of a house or in-ground pool.
Where the Regulated and Significant Tree Overlay applies, a tree is regulated once its trunk measures 1 m or more around, 1 m above natural ground, and significant at 2 m. Some trees within 20 m of a dwelling in a Medium or High bushfire risk area are exempt, so confirm the conditions with council before anyone cuts. Where approval is needed, the Code allows tree-damaging activity to fix or prevent extensive damage to a substantial building of value when there's no reasonable alternative, and for a significant tree only once all reasonable remedial treatments have proved ineffective.
So the evidence matters. A crack and footing report, from $990 + GST ($1,089 inc GST), shows whether the tree is the cause or whether a leak or poor drainage is, and addresses the tests the Code sets. The trees and house cracks guide explains the process.
What about Belair's railway-era stone cottages?
They need a stone-aware assessment and, inside the Historic Area, more paperwork. The Belair Village Historic Area Statement describes an 1880–1900 railway township built in sandstone or limestone with red-brick quoins. In the Historic Area Overlay even a low deck needs approval, and demolition is possible only on limited grounds, such as the structure being beyond reasonable repair, which a condition report has to show. Heritage stone assessments are a fixed quote.