Mezzanine and fit-out engineering in Adelaide
A mezzanine, a new opening, heavy racking or rooftop plant changes what an existing building has to carry. We check the building, design the new work and give your council or certifier the drawings and calculations they ask for.
- Fixed quoteper project, before we start
- Under 20 minaverage time to a fixed quote
- Documentedfor your certifier
In short
Mezzanine engineering in Adelaide means designing the floor, beams, columns and stair, then checking the slab or footings under every column for the load the mezzanine will carry. Fit-outs that cut new openings, add heavy racking or compactus, or put plant or solar panels on an existing roof need the same check. You receive calculations and drawings for your certifier, priced by fixed quote.
- Fee
- Fixed quote per project
- Quote
- In under 20 min on average, business hours
- You receive
- Calculations, drawings and a structural certificate
When you need us
When does a commercial fit-out need a structural engineer?
A commercial fit-out needs a structural engineer when it adds load to the building, removes or cuts into structure, or hangs something new from it. Partitions, ceilings and joinery on their own rarely need structural design, but your council or certifier decides what documents the job needs.
| Fit-out work | What changes structurally | What we provide |
|---|---|---|
| New mezzanine floor | Column loads land on a slab or floor that wasn't designed for them | Mezzanine design, slab or footing check, base plate details |
| New opening in a wall | The wall above loses its support, and the piers either side carry more load | Beam or lintel design, propping sequence, pier and footing checks |
| Removing a column or load-bearing wall | The load path through the floors and roof above changes | Transfer beam and connection design |
| Racking, compactus, safes and cool rooms | Concentrated loads on a suspended floor or a thin ground slab | Floor capacity check and, if needed, a strengthening design |
| Rooftop plant | Point loads, vibration and wind on air conditioning units, condensers and fans | Roof framing check and support frame design |
| Solar panel array | Extra permanent load, plus wind uplift on rails, fixings and purlins | Roof load assessment |
| Signs, awnings and hanging loads | New connections into existing steel, timber or masonry | Connection and fixing design |
Removing a wall in a house instead? See wall removal and beam design.
Mezzanines
How is a mezzanine floor designed?
A mezzanine floor is designed from the load it will carry down to the ground: decking, joists and beams, then columns, base plates and whatever sits under each column. Four questions decide most of the design.
What will the mezzanine carry?
Office use, light storage, archive shelving and plant are all different design loads under AS/NZS 1170.1, so the use goes on the drawings.
Known: we design for itUnsure: we agree a use and load with you firstAre there drawings of the existing slab?
Column loads usually land on the ground slab, and its thickness and reinforcement decide what it can take.
Yes: we check the slab from the drawingsNo: we confirm it on site, and quote any testing firstCan the slab take the column loads?
A thin slab on reactive clay, which much of Adelaide sits on, may not carry a heavily loaded column on its own.
Yes: base plates fixed to the slabNo: new pad footings under each columnIs it a supplier's kit mezzanine?
A kit design assumes a slab, a load and a building. Yours may differ.
Yes: we check the kit against your building and useNo: we design the frame, connections and bracing
Fire, exits and access
A mezzanine also raises fire safety, exit, stair and balustrade questions under NCC Volume One. Your council or certifier assesses those against the edition in force: NCC 2022 (as amended) in South Australia until 30 April 2027, then NCC 2025. We design the structure, stair and balustrade supports to suit the layout they accept.
Key takeaways
- The slab under each column matters as much as the steel above it.
- The intended use sets the design load, so tell us what will be stored and how high.
- Kit mezzanines still need checking against your building, slab and use.
- You receive drawings and calculations for your Building Rules Consent.
New openings
Can you put a new opening in a commercial wall?
Yes. A new opening in a commercial wall needs a beam or lintel to carry the wall above, a temporary propping sequence for the builder, and a check that the piers and footings either side can take the extra load. What else matters depends on the wall.
Blockwork, concrete and tilt-up
Reinforcement and grouted cores are located before cutting. Precast and tilt-up panels also rely on their connections, so the panel is checked as a whole.
Bluestone, sandstone and brick
Older Adelaide shopfronts often rely on lime mortar and arching action, and some carry salt damp decay at the base. State and local heritage places can need approval for work that affects their heritage value. See bluestone and heritage buildings.
Steel and timber framing
New headers and jamb posts carry the load, and any bracing removed with the wall is replaced elsewhere.
Earthquake and bracing
Adelaide's earthquake hazard is the highest of the capital cities and is part of our design checks. A new opening can take away bracing the building relies on.
Rooftop plant and solar
Can my roof take solar panels or rooftop plant?
Most commercial roofs can take a solar array or new plant, but each one should be checked. The risk is usually wind uplift on fixings and purlins, and point loads on older or corroded framing, rather than the weight alone.
Solar panels add a modest permanent load spread across the roof. The bigger questions are wind at the roof edges and corners, how the rails fix to the purlins and the purlins to the rafters, and whether an older roof is still in the condition its original design assumed. We work out the design wind for each building from its terrain, shielding, height and roof shape under AS/NZS 1170.2.
Rooftop plant such as air conditioning units, condensers and exhaust fans puts concentrated loads on a few points. We check the framing under each support, design a support frame where the roof needs one, and allow for vibration and wind on the units themselves.
You receive a roof load assessment for your installer, landlord or certifier, or a support frame design where the roof needs help.
Older roofs
Rusted purlins, undersized battens or a roof already carrying old plant can leave little spare capacity. Photos of the roof space and the existing fixings help us quote the right check.
| Roof load | What we check |
|---|---|
| Solar array | Uplift at edges and corners, rail and purlin fixings, framing condition |
| Condensers and fans | Point loads, vibration, the framing under each support |
| Signs and screens | Wind on the face, connections into the roof frame |
Quotes
What should I send for a fit-out quote?
A floor plan with the area marked, the intended use and photos of the existing structure are enough to price most fit-outs.
- The floor plan or fit-out layout, as a PDF, with the area to be engineered marked
- The intended use: what will be stored, racking type and height, equipment weights
- Photos of the existing structure: slab, columns, roof framing or the wall you want to open
- Existing drawings of the building, if the owner has them
- The supplier's drawings for a kit mezzanine, or the solar layout
- Your deadline, such as a lease start or the builder's program

Fixed quote
Know the fee before the fit-out starts
You'll have a fixed quote in under 20 minutes on average, during business hours (Mon–Fri 8:00am–5:00pm), with whether a site visit is needed and what you'll receive. Changing the layout of an existing building? A commercial building inspection first can show what the structure can take.
More commercial engineering
Often needed alongside a fit-out

Steel structures & warehouses
Steel frame design and steel frame certification for warehouses, sheds, canopies and light steel frames, with footings and slabs designed for the site's clay.
Fixed quoteLearn more
Commercial building inspections
Structural condition assessments, defect reports, concrete spalling reports and change of use assessments for offices, shops, warehouses, car parks and older stone buildings.
Fixed quoteLearn more
Wall removal & beam design
Load-bearing wall removal designed properly: the beam, posts and footings, with drawings and calculations for your builder and certifier.
from$790+ GST$869 inc GSTLearn moreDoes a mezzanine floor need approval in SA?
Usually. Internal alterations are only exempt when they won't adversely affect the building's structural soundness, and a mezzanine adds new structure and floor loads, so expect to apply for Building Rules Consent on PlanSA. Your council or certifier confirms what's needed, and our drawings and calculations go with the application.
Can a warehouse slab support a mezzanine?
Often, but it depends on the slab's thickness and reinforcement, the ground under it and the column loads. We check it from drawings or on site, and where it can't take the loads we design new pad footings under each column.
Do I need an engineer for a shop or office fit-out?
Only if the fit-out changes the structure: a new opening, a mezzanine, heavy racking or a cool room on a suspended floor, or anything hung from the roof. Partitions, ceilings and joinery on their own rarely need structural design.
Can my roof take solar panels?
Most roofs can, but each one should be checked. We look at the roof framing and fixings for the added load and the wind uplift at edges and corners, then issue a roof load assessment for your installer, landlord or certifier.
Can you certify a mezzanine that's already built?
Yes. We inspect it, check what was built against the loads it carries, and either certify it or design the changes it needs. If it was built without approval, ask your council or certifier about the application; our report and certificate can go with it.
How much does mezzanine engineering cost?
Commercial work is priced by fixed quote per project, based on the size of the mezzanine, what's known about the existing slab and whether a site visit is needed. You'll have the fixed fee in under 20 minutes on average, during business hours.
Do you supply or install mezzanines?
No. We are engineering only: we design, check and certify. Any mezzanine supplier or licensed builder can build from our design, and we don't recommend one.