Developers · Building designers · Builders
Townhouse and infill engineering in Adelaide
Structural and civil design for townhouses, units and small infill developments across Greater Adelaide: site classification and footings on reactive clay, framing and beams, retaining walls, stormwater tanks, and the neighbour paperwork that comes with building close to a boundary.
- Fixed quoteper project, before we start
- Under 20 minaverage time to a fixed quote
- Documentedfor your certifier
In short
A townhouse engineer in Adelaide designs the structure of small multi-residential and infill projects: site classification and footings, slabs, framing and beams, retaining walls and stormwater. On infill blocks that also means trees near footings, neighbours' footings at the boundary and the Code's rainwater tank rules. You receive calculations, drawings and stage inspections for your certifier, priced by fixed quote.
- Fee
- Fixed quote per project
- Quote
- In under 20 min on average, business hours
- You receive
- Calculations, drawings and stage inspections
Greater Adelaide growth
How much new housing is Greater Adelaide planning for?
The Greater Adelaide Regional Plan, released in March 2025, identifies where 315,000 new homes will be built over the next 30 years, for a population expected to grow by about 670,000 people by 2050. It mixes greenfield growth areas with strategic infill sites, and it dropped the earlier target of 85% of new housing as infill.
On the ground, a lot of townhouse work in established suburbs is still small infill: one older house replaced by two, three or four dwellings on the same block. Those sites bring the same engineering questions every time:
- Clay that has dried out under the old house and its trees, then wets up once the site is cleared.
- New trees the Code requires, planted close to new footings.
- Neighbours' footings at the boundary, often old and shallow.
- Stormwater from more roof on a smaller site, to the Code's tank and detention rules.
The plan also targets tree canopy cover of 30% by 2055, and where the Code's Urban Tree Canopy Overlay applies, new dwellings already need trees on site.

Stage by stage
What does a townhouse development need from a structural engineer?
A townhouse development needs a structural engineer from before the design is drawn to the final frame inspection. This is how the engineering usually falls on an Adelaide infill project.
| Stage | Engineering | Why it matters in Adelaide |
|---|---|---|
| Before design | Site classification to AS 2870, and a check of the overlays, easements and trees on and next to the site | Much of Adelaide sits on highly reactive clay, and every site needs its own classification |
| Concept | Advice to the building designer on spans, garages under living areas and stacked floors | Garages and open-plan ground floors need beams that shape the plan |
| Documentation | Footings and slabs, framing and beams, bracing and tie-down, retaining walls and the stormwater plan | Wind and earthquake are part of our design checks; Adelaide's earthquake hazard is the highest of the capital cities |
| Approval | Drawings and calculations for Building Rules Consent on PlanSA | A Level 3 certifier covers Class 1 buildings up to 2 storeys and 500 m², Level 2 up to 3 storeys and 2,000 m²; both need the calculations independently certified |
| Neighbours | Section 139 assessment, dilapidation reports and any shoring design | The neighbour can have a professional engineer specify shoring or underpinning, and the building owner pays the reasonable cost of that report and plans |
| Construction | Inspections of footings, reinforcement and framing at the stages in the quote | The builder signs Part A of the Statement of Compliance, the owner Part B; our certificates go with it |
Removing a row of trees or an old house? Tell us at the start: the footing design allows for the ground recovering its moisture.
Trees and footings
How do trees near new footings affect an infill design?
Trees change the moisture in reactive clay, and AS 2870 counts trees near footings among the abnormal moisture conditions a footing design has to allow for. On infill sites that works in two directions: trees removed to clear the block, and trees the Code requires you to plant.
| Site area per dwelling | Urban Tree Canopy Overlay trees |
|---|---|
| Under 450 m² | 1 small tree |
| 450–800 m² | 1 medium or 2 small trees |
| Over 800 m² | 1 large, 2 medium or 4 small trees |
Small: 4 m high with 10 m² of soil. Medium: 6 m with 30 m². Large: 12 m with 60 m². Retained trees earn discounts, and an offset payment ($533, $1,065 or $1,598 per tree) is allowed only in some zones and areas. Check the overlay for your site.
Regulated trees on and next to the site
Inside the Regulated and Significant Tree Overlay, a tree with a trunk circumference of 1 m or more (measured 1 m above ground) is regulated, and 2 m or more is significant. Trees within 3 m of a house or in-ground pool are exempt, except eucalypts, Corymbia, Angophora and willow myrtle. The building consent site plan must show any regulated tree on the site or on adjoining land.
- Trees removed: the clay under them can swell as it wets up over the following seasons
- Trees planted: small and medium trees close to new slabs still draw moisture as they grow
- Neighbours' trees: roots cross boundaries, so large trees next door count too
More in the guide to trees and house cracks in SA.
Stormwater
How much rainwater tank storage does each townhouse need?
Where the Code's Stormwater Management Overlay applies, each dwelling needs a rainwater tank sized to its own site area, plumbed to a toilet or the laundry, with detention added where the site has little pervious ground. It covers detached, semi-detached and row dwellings, fewer than 5 group dwellings, co-located housing and flat dwellings.
| Site area per dwelling | Retention | Detention |
|---|---|---|
| Under 200 m² | 1,000 L | 1,000 L |
| 200–400 m² | 2,000 L | 1,000 L if site perviousness is under 30% |
| 401 m² and over | 4,000 L | 1,000 L if site perviousness is under 35% |
The tank must collect at least 60% of the roof for a detached (not battle-axe), semi-detached or row dwelling, otherwise 80%. Detention uses a 20–25 mm slow-release orifice. Check the overlay on the SA Property and Planning Atlas for each site.
Kerbs and easements
Kerb connections need council approval. If the block has an SA Water easement, building on it needs SA Water's approval, applied for at the same time as council, and the footings keep clear of the main. See stormwater and drainage plans and the guide to stormwater rules in Adelaide.
Key takeaways
- Tank size follows each dwelling's site area, not the whole block.
- Required trees and removed trees both go into the footing design.
- Neighbours' footings at the boundary need checking before you dig.
Neighbours
What happens when an infill site is dug close to the neighbours?
Excavation that cuts below a line drawn at 1 vertical to 2 horizontal from 600 mm under natural ground at the boundary, or fill within 600 mm of the boundary, triggers section 139 of the PDI Act. The building owner serves a Form 1 notice at least 20 business days before work starts.
Check the trigger
We check the footing and retaining wall depths against the 1V:2H line and say whether a notice is needed.
Dilapidation report
A dated photo record of the neighbour's building, so any later claim is measured against facts. See dilapidation reports.
Shoring design
If the neighbour's engineer asks for shoring or underpinning, we design it for your builder. Every new building is designed assuming the neighbour may one day dig to that line too.
More in the guide to neighbour excavation in SA.
Planning townhouses?
Send the drawings for a fixed quote
A concept plan with the address and the number of dwellings is enough to start. You'll have a fixed fee in under 20 minutes on average, during business hours.
More commercial engineering
Often needed on a townhouse site

Site classification & footings
AS 2870 site classification and footing or slab design for new homes, extensions and granny flats on Adelaide's reactive clay.
from$1,200+ GST$1,320 inc GSTLearn more
Stormwater & drainage plans
Drainage plans that size your rainwater tank and detention to the Code, route the pipes to the kerb or an easement and keep water away from your footings.
from$790+ GST$869 inc GSTLearn more
Dilapidation reports
A dated, measured record of a building's condition before excavation, demolition or building starts next door, with a follow-up report after the work.
from$690+ GST$759 inc GSTLearn moreFAQ
Townhouse and infill engineering FAQs
Still unsure? Call 08 7083 9853 or send photos for a fixed quote.
Do townhouses need a structural engineer in SA?
In practice, yes. Townhouses need footings designed for the site's classification, beams over garages and open-plan rooms, and often retaining walls and stormwater design. A Building Level 2 or 3 certifier also needs the structural calculations certified by an independent technical expert.
What's the difference between townhouses and units under the NCC?
Townhouses side by side, separated by fire-resisting walls, are usually Class 1a buildings under NCC Volume Two. Units stacked one above another are usually Class 2 under NCC Volume One, with fire and sound rules that shape the floors. Your certifier confirms the classification.
How much rainwater tank storage does each townhouse need?
Where the Stormwater Management Overlay applies, it depends on each dwelling's site: 1,000 L retention plus 1,000 L detention under 200 m², 2,000 L for 200–400 m² and 4,000 L above that, plus 1,000 L detention on larger sites with little pervious ground. We size and detail it in the stormwater plan.
Do I have to plant trees on an infill site?
Where the Urban Tree Canopy Overlay applies, yes: at least one small tree per dwelling on sites under 450 m², more on bigger sites, or an offset payment in some zones. New trees close to new footings on reactive clay are allowed for in the footing design.
What if my neighbour's house is close to the boundary?
If your excavation or fill near the boundary triggers section 139, you must serve a Form 1 notice at least 20 business days before work starts, and the neighbour can have a professional engineer specify shoring or underpinning, with you paying the reasonable cost of that report and plans. A dilapidation report first records their building's condition.
Does the builder need building indemnity insurance for townhouses?
For domestic building work of $20,000 or more that needs approval, yes, with $250,000 cover since 10 November 2025. Buildings over 3 storeys with 2 or more dwellings are exempt. It's the builder's policy and doesn't cover engineering advice.
How much does townhouse engineering cost?
Townhouse and infill work is priced by fixed quote per project, based on the number of dwellings, the site and the inspections needed. You'll have the fixed fee in under 20 minutes on average, during business hours.
Do you build or recommend builders?
No. We are engineering only: we design, certify and inspect. Any licensed builder can price and build from our drawings.