When cracks, sagging or out-of-level floors appear in new or recent building work, you need facts before you argue about who fixes it. We inspect the structure, compare it with the approved drawings, the engineer's design and the standards, and write an independent report you can put in front of your builder.
- Fixed quoteper job, before we start
- Under 20 minaverage time to a fixed quote
- Engineering onlyno repair to sell
In short
A building defect report from an independent structural engineer records what is wrong with the structure of new or recent building work, why it happened and what fixing it involves, measured against the approved drawings, the NCC and Australian Standards. Each report is priced by fixed quote, sent in under 20 minutes on average, during business hours, for homes across Greater Adelaide and the Adelaide Hills.
- Fee
- Fixed quote per job, before we start
- You receive
- A report with a defect register and photos
- Independent
- No rectification to sell and no builder to recommend
Scope
Which building defects can a structural engineer assess?
A structural engineer assesses defects in the parts of a building that hold it up: footings and slabs, walls, framing, beams, roofs and retaining walls. Here is what we look at most in new and recent work.
Slabs and footings
Cracked or heaving slabs, edge settlement and footings that don't match the design or the site class on reactive clay.
Walls and masonry
Cracking in brickwork and render, missing or misplaced articulation joints, lintels and wall ties.
Framing and roofs
Sagging, cut or altered trusses, missing bracing and tie-downs, and over-spanned rafters or joists.
Beams and steelwork
Beams, posts and connections checked against the engineer's drawings for size, bearing and fixing.
Floors out of level
Floor level surveys that show whether movement is within the tolerance expected, or continuing.
Retaining walls and drainage
Leaning or cracked walls, missing drainage behind them, and stormwater that soaks the footings.
Is it a defect, or normal movement?
Not every crack in a new home is a defect. Concrete and plaster shrink as they dry, and much of Adelaide sits on highly reactive clay, so some movement is expected; every site needs its own classification, and the footings should have been designed for it. The questions are how wide the cracks are, what pattern they make, whether they are growing, and whether the work matches the design.
We use the AS 2870 damage categories as a guide to severity, alongside the pattern and location of the cracks. Where movement may be continuing, we can set up monitoring before anyone agrees a repair. Our guide to cracks in walls in Adelaide explains the patterns.
- Cat 0Negligible< 0.1 mm
- Cat 1Very slight< 1 mm
- Cat 2Slight< 5 mm
- Cat 3Moderate5–15 mm
- Cat 4Severe15–25 mm
- Cat 5Very severe> 25 mm
Disputes
What do you need before a dispute with your builder?
You need the documents that say what should have been built, and evidence of what was built. A dispute that turns on facts is easier to settle, whether you talk it through with the builder or take advice on your options. We don't give legal advice; a lawyer can explain the paths open to you.
Council inspections are a sample, not a check of every stage: current policies require 66% of new houses to be inspected. At completion the builder signs Part A of the Statement of Compliance and you sign Part B, and your decision notice lists any certificates or reports that must go with it (regulation 57(8)(c)). Ask for those documents early.
Building indemnity insurance in brief
It's the builder's policy. Builders need it for domestic work of $20,000 or more that needs approval (since 10 November 2025), with $250,000 cover. It doesn't cover engineering advice. SAFA's building indemnity insurance page explains when it applies.
Documents to gather
| Document | Why it matters |
|---|---|
| Development approval and the approved plans | Show what council or the certifier approved |
| Engineer's drawings and calculations | The structural design the builder had to follow |
| Soil report or site classification | The basis of the footing design |
| Statement of Compliance | The builder's signed statement at completion |
| Certificates listed in the decision notice | Any inspections or reports the consent required |
| Building indemnity insurance certificate | The builder's policy for the job, where one was needed |
| Contract, variations, emails and dated photos | What was agreed, and when each defect appeared |
Ask your builder, council or certifier for copies of anything you don't have. Send what you can; the quote says what else would help.
How it works
How does a building defect report work?
You send what you have, we quote a fixed fee, inspect the work and write a report that stands on its own.
- Step 1
Send photos and documents
Photos of each defect, the approved plans, the engineer's drawings and the builder's response so far.
- Under 20 min on average
Get a fixed quote
During business hours, with what's included and how long the inspection takes.
- On site
Inspection
Measurements, levels and photos, with the drawings in hand.
- As agreed in your quote
Defect report
A defect register, the likely cause of each defect, how it compares with the design and standards, and what rectification involves.
- If you need it
Rectification design and check
Engineering for the fix, a review of the builder's proposal, or an inspection of the finished repair.
| Item | Location | Element | Observation | Width | Rating |
|---|---|---|---|---|---|
| 1 | Garage, rear wall | Brickwork | Stepped crack, no articulation joint where drawn | 3 mm | Cat 2 |
| 2 | Living room | Slab | Floor falls 22 mm over 4 m toward the corner | n/a | Check |
| 3 | Bedroom 3 | Plaster | Fine crack at cornice | <0.1 mm | Cat 0 |
| 4 | Alfresco | Steel beam | Bolts missing at post connection | n/a | Check |
Which report?
Defect report, structural inspection or dilapidation report?
The right report depends on the question you need answered.
| Report | Building defect report | Structural inspection | Dilapidation report |
|---|---|---|---|
| The question | Is new or recent building work defective, and what does fixing it involve? | What is wrong with my house, and why? | What is the condition before work next door? |
| Measured against | Approved drawings, the engineer's design, the NCC and Australian Standards | Engineering judgement and the standards | The building's own later condition |
| Typical use | Discussions or a dispute with the builder | Cracks, movement, a repair decision | Excavation, demolition or building next door |
| Price | Fixed quote per job | From $990 + GST ($1,089 inc GST) | From $690 + GST ($759 inc GST) |
| Page | This page | Structural inspection | Dilapidation reports |
Where we work
Where do you inspect building defects?
Across Greater Adelaide and the Adelaide Hills, including new homes in growth areas around Mount Barker and Morphett Vale, and extensions and renovations in every suburb. We can review documents and photos anywhere in South Australia, though a defect report almost always needs a site visit. See all areas.
South Australia does not currently register engineers; our reports measure work against the NCC and Australian Standards, and we have no stake in who carries out the rectification. Use the form above or the full quote form to send photos and documents.
Related services
Often needed alongside a defect report

Structural inspection & report
An engineer's report on what's wrong with the structure, why it's happening and what to do next, for any Adelaide home.
from$990+ GST$1,089 inc GSTLearn more
Cracks & footing movement
Cracks measured and mapped, the cause found in the ground, the water or the building, and the repair priority set before anyone quotes for underpinning.
from$990+ GST$1,089 inc GSTLearn more
Engineer's certificates
Engineer's letters, structural adequacy reports and independent certification of structural calculations, ready for your council or building certifier.
from$390+ GST$429 inc GSTLearn moreWhat is a building defect report?
An independent report on defects in building work: what each defect is, where it is, how serious it is and what fixing it involves. Ours cover the structure: footings, slabs, walls, framing, beams, roofs and retaining walls.
How much does a building defect report cost in Adelaide?
Defect reports vary too much for one starting price, so each one gets a fixed quote in under 20 minutes on average, during business hours. The quote depends on the size of the building, the number of defects and how many documents we need to review.
Can a structural engineer help in a dispute with my builder?
Yes. A dispute usually turns on facts: whether the work matches the drawings and the standards, and what caused the damage. Our report sets those out with measurements and photos, and we have no repair or builder to sell.
Does building indemnity insurance cover defects?
Building indemnity insurance is the builder's policy. Builders need it for domestic work of $20,000 or more that needs approval (since 10 November 2025), with $250,000 cover. It doesn't cover engineering advice. SAFA's website explains when a claim can be made.
Do you check the work against the approved plans?
Yes, if you send them. We compare what's built with the approved consent drawings, the engineer's design and the relevant Australian Standards, and say where they differ and whether it matters structurally.
Is a crack in a new house always a defect?
No. Some fine shrinkage cracking is expected in new concrete and plaster. Width, pattern and whether it is growing tell us whether it points to a structural problem, with the AS 2870 damage categories as a guide.
Do you cover waterproofing, plumbing or finishes?
We report on the structure. Where a problem is clearly outside it, such as waterproofing, plumbing or tiling, we say so and name the kind of specialist who can assess it, without recommending a business.
Do you fix defects or recommend builders?
No. We are engineering only: we inspect, report and, if you ask, design the rectification. We never carry out the work or recommend a contractor for it.