
Homeowners · Builders · Designers
Engineer's certificates and structural adequacy reports for your certifier
Councils and building certifiers in South Australia often need an engineer's word on a structure: a letter that existing work is adequate, a certificate your consent lists, or independent certification of another designer's calculations. We inspect, check and certify. Your builder still signs the Statement of Compliance.
- From $390+ GST ($429 inc GST)
- Under 20 minaverage time to a fixed quote
- Reg 25(5)independent certification of calculations
In short
An engineer's certificate or structural adequacy letter in Adelaide starts from $390 + GST ($429 inc GST). It's a written statement that a structure, built or designed, meets the NCC and Australian Standards for its use. Certifiers at Building Level 2 or 3 can grant building consent only once the structural calculations are certified by an independent technical expert (PDI Regs reg 25(5)).
- Fee
- From $390 + GST ($429 inc GST)
- You receive
- A letter, certificate or report
- Used for
- Building Rules Consent, completion documents, approval of existing work
Which document?
Which engineer's certificate do you need?
The one your council or certifier asks for, and the request usually says which. These are the five we're asked for most, with when each comes up.
| Document | When it's asked for | What we do |
|---|---|---|
| Engineer's letter for council or a certifier | During assessment, when the certifier has a structural question | A short written answer on one item, such as a beam, a footing or a fixing |
| Structural adequacy report | Seeking approval for work already built, or checking a structure before sale | Inspect and check the structure, then state whether it is adequate or what must change |
| Independent certification of calculations | Building consent from a Building Level 2 or 3 certifier (reg 25(5)) | Check another designer's calculations and certify them as an independent technical expert |
| Completion certificate or report | Listed in your decision notice, to go with the Statement of Compliance (reg 57(8)(c)) | Inspect the built item, such as footings, steelwork or a retaining wall, and certify it |
| Certificate with our own design | When we design the structure | Drawings and calculations for your application |
Regulation numbers refer to the Planning, Development and Infrastructure (General) Regulations 2017. Your certifier's written request is the best guide to what they need.
Who does what in South Australia?
Your application goes through PlanSA. Building Rules Consent comes from council or an accredited professional, a building certifier at Building Level 1, 2 or 3. When council assesses the building rules itself, it must seek the advice of a suitably accredited professional (reg 26(2)). Planning Consent and Building Rules Consent together make up Development Approval.
The engineer's part is narrower: we design, check or inspect the structure and certify it. We don't grant consent, and we don't sign the Statement of Compliance. Our guide to building approvals in SA sets out each step.
- Accredited professional
- A building certifier or planner accredited under the PDI Act scheme. Not an engineer's title.
- Independent technical expert
- The person who certifies structural calculations for a Level 2 or 3 certifier. Not the owner, not involved in the development, no financial interest.
- Statement of Compliance
- Lodged at completion. The builder signs Part A, the owner Part B.
- Decision notice
- Your consent. It lists any certificates or reports needed at completion.
Regulation 25
What is independent certification of structural calculations?
It's a check of the structural calculations by an engineer who had no part in the project, required before a Building Level 2 or 3 certifier can grant building consent. Regulation 25(5) says the calculations for that work must be "certified by an independent technical expert".
Regulation 25(7) defines that person. They are not the building owner or the owner's employee. They have not been involved in any aspect of the development, beyond preliminary advice of a general nature, and have no direct or indirect financial interest in it. And they hold engineering or other qualifications the authority accepts.
That is why we can't certify our own designs this way, and why builders and designers send us calculations prepared by someone else. We check the loads, the design against the NCC and Australian Standards, and the drawings against the calculations, then certify, or tell you what needs fixing first.
Regulation 61: certified structural details
For materials and forms of construction covered by Part B1 or Part H1 of the Building Code, the structural provisions, regulation 61 says the relevant authority must accept compliance to the extent an independent technical expert certifies it and sets out the basis in detail.
Who can grant building consent, and when calculations need certifying
| Relevant authority | Can give building consent for | Independent certification? |
|---|---|---|
| Council | Any class, with advice from an accredited professional | Not required by reg 25(5) |
| Building Level 1 | Any class of development | Not required by reg 25(5) |
| Building Level 2 | Buildings up to 3 storeys and 2,000 m² | Yes, reg 25(5) |
| Building Level 3 | Class 1 and 10 buildings up to 2 storeys and 500 m² | Yes, reg 25(5) |
| Building Level 4 | Cannot give building consent | Not applicable |
From the PDI (General) Regulations 2017, regs 25 and 26. Your certifier can tell you which level they hold.
Existing work
Can an engineer certify work that's already built?
Yes, when enough of the structure can be seen and checked. Unapproved work tends to surface when a house is sold or when council writes: a verandah, carport or deck built without approval, a wall taken out years ago, or an extension with no paperwork. Getting it approved usually means an application on PlanSA, and the certifier needs evidence that the structure is adequate.
A structural adequacy report gives them that. We inspect, measure the members and connections, check them against the loads and the standards, and state whether the structure is adequate for its use. If it isn't, the report says what has to change, and we can design the fix.
Hidden parts are the limit. If we can't see the footings, the fixings or the framing, we may need a small area opened up, or the original drawings, before we can certify it. The quote says so up front.
Ask the certifier first
Send us the certifier's or council's written request. It tells us exactly what they need, which keeps the scope, and the fee, as small as possible. Use the form above or the full quote form.

What to send
What do we need to issue a certificate?
Enough to check the structure without guessing. Send what you have; the quote tells you if anything else is needed.
For one item or a listed certificate
- The certifier's request or your decision notice
- The approved drawings for the item
- Photos during construction, if it's now covered
For work already built
- Photos of the structure, close up and from further back
- Rough sizes, spans and what it's built from
- Any drawings, receipts or old approvals
For a Level 2 or 3 certifier
- The full calculations and the structural drawings
- The architectural plans and the site classification
- The certifier's name and level
From $390 + GST ($429 inc GST). A letter or certificate on a straightforward structure. Site visits, opening-up or a full set of calculations to check add to the fee, and you get a fixed quote in under 20 minutes on average, during business hours.
Get a fixed quoteCompletion
Who signs what at completion?
The builder and the owner sign the Statement of Compliance; the engineer supplies the certificates your consent lists. Part A is signed by the licensed building work contractor, or, if there is none, a registered building work supervisor or a building certifier. Part B is signed by the owner. It is lodged on PlanSA with the notice of completion, together with any certificates or reports your decision notice listed under regulation 57(8)(c).
A Statement of Compliance isn't needed for Class 10 buildings such as sheds and carports, except swimming pools and private bushfire shelters. We certify against the NCC edition that applies to your consent: NCC 2022 (as amended) until 30 April 2027, and NCC 2025 from 1 May 2027.
South Australia does not currently register engineers; our certificates rest on structural design and checks to the NCC and Australian Standards. We work from drawings and photos anywhere in South Australia, and visit sites across Greater Adelaide and the Adelaide Hills.
Related services
Work we're often asked to certify

Verandahs, pergolas, carports & decks
Engineering and certificates for verandahs, pergolas, carports and decks: posts, beams, tie-down and footings on reactive clay.
from$490+ GST$539 inc GSTLearn more
Wall removal & beam design
Load-bearing wall removal designed properly: the beam, posts and footings, with drawings and calculations for your builder and certifier.
from$790+ GST$869 inc GSTLearn more
Structural inspection & report
An engineer's report on what's wrong with the structure, why it's happening and what to do next, for any Adelaide home.
from$990+ GST$1,089 inc GSTLearn moreWhat is an engineer's certificate?
A written statement from an engineer that a structure, or a design, meets the relevant standards for its use. In South Australia a council or building certifier usually asks for one, either with an application or at completion.
What is a structural adequacy report?
A report that checks an existing structure, such as a verandah, deck, carport or altered wall, and states whether it is adequate for its use. If it isn't, it says what needs to change. Certifiers often ask for one when approval is sought for work already built.
Who signs the Statement of Compliance?
The builder. The licensed building work contractor signs Part A (or a registered building work supervisor or building certifier if there is none) and the owner signs Part B. We supply the certificates or reports your consent lists to go with it.
What is an independent technical expert?
The person who certifies structural calculations so a Building Level 2 or 3 certifier can grant consent (reg 25(5)). They can't be the owner or the owner's employee, can't have been involved in the development or have a financial interest in it, and need qualifications the authority accepts.
Can you independently certify your own design?
No. An independent technical expert must not have been involved in the development, so we can't independently certify calculations we prepared. We can certify calculations prepared by another engineer or designer.
Can you certify work that's already built?
Often, yes, if we can see enough of it. We inspect, measure and check the structure. Where footings, fixings or framing are hidden, we may need small areas opened up or the original drawings before we can certify it.
How much does an engineer's certificate cost in Adelaide?
From $390 + GST ($429 inc GST) for a letter or certificate on a straightforward structure. A site visit, opening-up or a full set of calculations to check adds to the work, and you get a fixed quote in under 20 minutes on average, during business hours.
Are engineers registered in South Australia?
No. South Australia does not currently register engineers. Every certificate we issue rests on structural design and checks to the NCC and Australian Standards.