In short
You need a structural engineer when the work relies on the structure: removing a load-bearing wall, a retaining wall over 1 m, new footings, underpinning, or cracks that need a cause found. A building certifier (an accredited professional) or the council grants Building Rules Consent; they assess, they don't design. A building inspector reports on condition before you buy. Most structural jobs in SA need both.
Key takeaways
- Engineers inspect, diagnose, design and certify the structure. South Australia does not currently register engineers, so ask about their qualifications and experience.
- Building Rules Consent comes from the council or an accredited professional at Building Level 1, 2 or 3. A Level 4 inspector can't grant it.
- A pre-purchase building inspector reports on visible condition. A suspected structural defect is a job for an engineer.
- The builder signs Part A of the Statement of Compliance and the owner signs Part B. The engineer supplies any certificates or reports the consent lists.
Three different people can look at the same Adelaide house, and their jobs are easy to mix up. A structural engineer works out what holds the building up and designs or certifies it. A building certifier, or the council, checks building work against the rules and grants Building Rules Consent. A building inspector reports on a home's condition, usually before a sale. Here is what each one does in South Australia, and how to tell which you need.
Engineer, certifier or inspector: quick facts
- Designs the structure
- A structural engineer: inspections, drawings, calculations, certificates
- Grants Building Rules Consent
- Council, or an accredited professional at Building Level 1–3
- Reports before you buy
- A building inspector, with a visual condition report
- Where you apply
- PlanSA, for Planning Consent and Building Rules Consent
- Statement of Compliance
- Part A the builder, Part B the owner
- Our fees
- Desktop review from $350 + GST, full inspection report from $990 + GST
What is the difference between a structural engineer, a certifier and a building inspector?
A structural engineer designs and checks the footings, beams, walls and connections that carry the load; a building certifier assesses the whole proposal against the Building Code and grants consent; a building inspector describes the visible condition of a home. One designs, one approves, one reports. A certifier won't size your beam, and an engineer can't approve the work.
| Question | Structural engineer | Building certifier | Building inspector |
|---|---|---|---|
| Main job | Inspect, diagnose, design and certify the structure | Assess building work and grant Building Rules Consent | Report on a building's visible condition |
| Status in SA | Not registered by the state; ask about qualifications and experience | Accredited professional, Building Level 1–4, on PlanSA's register | Varies: ask about qualifications and insurance |
| What you receive | Report, drawings, calculations, certificates | Building Rules Consent, conditions, the documents to lodge at completion | A written condition report, often to AS 4349.1 |
| Grants building consent? | No | Yes, at Levels 1–3 within their limits | No |
| Designs a repair? | Yes | No | No |
| Typical trigger | Cracks, wall removal, footings, retaining walls, certificates | Any building work that is development | Buying a home |
Roles under the Planning, Development and Infrastructure Act 2016 and its General Regulations 2017. Your certifier or council confirms the approval path for your job.
The council stays involved whoever grants consent. It receives the builder's notices and inspects work once it starts: PlanSA says current policies inspect 66% of new houses, 90% of new commercial buildings and 100% of new swimming pools. When a council assesses the building rules itself, it must seek the advice of a suitably accredited professional (reg 26(2)).
When do you need a structural engineer in South Australia?
You need a structural engineer when the job designs, repairs or assesses the parts that carry load: footings, beams, load-bearing walls, retaining walls and the ground under them. These are the common South Australian triggers.
- Removing or altering a load-bearing wall. Internal alterations are exempt only when they remove nothing more than fixtures, fittings or non-load-bearing partitions and don't affect the building's structural soundness. See wall removal and beam design.
- Retaining walls over 1 m, or a wall plus fence over 2.1 m from the low side. Councils such as Salisbury ask for the engineer's footing calculations. Read retaining wall rules in SA.
- Underpinning. It usually needs building consent; we confirm with your council or certifier. Get a diagnosis before a design. See underpinning assessment.
- Extensions, second storeys and granny flats. New footings need a site classification and a footing design to AS 2870. See extensions and renovations.
- Decks, verandahs and carports that aren't exempt, such as a deck higher than 500 mm or within 900 mm of a boundary. See verandahs, pergolas, carports and decks.
- In-ground pools deeper than 300 mm. They need approval, and the council checks "the adequacy of structural support". See pool engineering.
- Cracks, sloping floors and sticking doors. Someone has to find the cause before anyone prices a repair. See our crack and footing report.
- A neighbour digging near your boundary. Under section 139 you can have a professional engineer specify shoring or underpinning, at the building owner's cost. Read your neighbour is digging next door.
An architect or building designer draws the building. When the drawings need a beam, a footing or a wall that standard tables don't cover, the engineer designs that part and signs for it.
When do you need a building certifier in South Australia?
You need Building Rules Consent, from the council or an accredited professional, for any building work that is development. The state's Accredited Professionals Scheme, running since 1 April 2019, accredits building certifiers at four levels, and each level sets what they may approve.
| Accreditation | Can grant building consent for |
|---|---|
| Building Level 1 | Any class of building |
| Building Level 2 | Buildings up to 3 storeys or 2,000 m², with the structural calculations independently certified |
| Building Level 3 | Class 1 and 10 buildings (houses, sheds, carports, pools) up to 2 storeys and 500 m², with the structural calculations independently certified |
| Building Level 4 (Inspector) | Cannot grant consent |
PDI (General) Regulations 2017, reg 25, and the state's fact sheet on engaging an accredited professional. Check a certifier on the PlanSA accredited professionals register.
That independent check matters to you. Before a Building Level 2 or Level 3 certifier can grant consent, the structural calculations must be certified by an "independent technical expert" (reg 25(5) and (7)). That person can't be the owner or the owner's employee, can't have been involved in the development or have a financial interest in it, and needs engineering qualifications the relevant authority accepts. We provide independent certification of structural calculations for your certifier, from $390 + GST.
Which jobs need both an engineer and a certifier?
Most structural work on a house needs both: the engineer designs it, and the certifier or council assesses it and grants Building Rules Consent.
| Job | Approval | Engineer | Certifier or council |
|---|---|---|---|
| Removing a load-bearing wall | Building Rules Consent | Beam, posts and footings | Assesses and grants consent |
| Underpinning | Usually building consent; confirm for your job | Diagnosis, design, inspections | Confirms the path, grants consent |
| Retaining wall over 1 m | Development approval | Wall design, drainage, 1:200 elevations | Assesses the application |
| Extension or second storey | Planning Consent and Building Rules Consent | Site class, footings, beams, framing | Building Rules Consent |
| Granny flat | Planning Consent and Building Rules Consent | Site class, slab, footings, frame | Building Rules Consent |
| In-ground pool over 300 mm deep | Development approval | Shell design, nearby footings and slopes | Consent; council inspects every pool's safety features |
Exemptions change in heritage, coastal, flood and bushfire areas. Our building approvals guide sets out what's exempt and the conditions.
Do I need a building inspector or a structural engineer before I buy?
Start with a pre-purchase building inspection, and bring in a structural engineer if the inspector flags cracking, movement, sloping floors or a failing retaining wall. A building inspection is a visual survey of condition, commonly prepared to AS 4349.1. It tells you what is visible; it doesn't diagnose the cause or design a fix.

Our pre-purchase structural inspection starts from $990 + GST ($1,089 inc GST). For the full comparison, read building inspector or structural engineer before you buy.
How do you check a structural engineer in South Australia?
Ask about their qualifications and their experience with work like yours, because the state doesn't check them for you: "At this time South Australia doesn't require engineers to be registered to practise," says Engineers Australia. The government consulted on a scheme in 2023 and decided its first phase would cover only structural and fire safety engineers on buildings of medium, high and very high complexity, which is not typical house work. In April 2026 Engineers Australia reported that the scheme had been paused.
- Experience with your kind of job, such as cracking on reactive clay, a load-bearing wall or a retaining wall on a slope
- The standards named in the document, such as the NCC and AS 2870, so your certifier can check them
- Independence: does the engineer, or the business, also sell the repair?
SA law names engineers in a few places. For neighbour excavation under section 139, a "professional engineer" means a corporate member of Engineers Australia, or a person on the National Engineering Register, with civil or geotechnical competence (reg 64(5)). Our structural design follows the NCC and Australian Standards.
When to call a structural engineer
Call a structural engineer first whenever the question is about the structure itself. The certifier comes in once there is a design to assess. We visit sites across Greater Adelaide and the Adelaide Hills and review photos and plans anywhere in South Australia.
- Cracks are 5 mm or wider, keep growing, or come with sticking doors and sloping floors
- You want to remove a wall and don't know whether it's load-bearing
- A retaining wall will retain more than 1 m, or carry a fence that takes it over 2.1 m
- Your certifier has asked for calculations, a footing design or independent certification
- You have a repair quote, such as underpinning, and want an independent view first
- You're buying and the building inspector has flagged something structural
Not sure? Send photos
Photos or plans are enough for a fixed quote in under 20 minutes on average, during business hours. If the job doesn't need an engineer, we'll say so. Ask for a quote.
Need an engineer?
Not sure who you need?
Tell us about the job. Our fixed quote, in under 20 minutes on average, during business hours, says whether it needs an engineer at all.
Sources
- Planning, Development and Infrastructure (General) Regulations 2017 (SA), version of 29.10.2026. Reg 25 (who may grant building consent, independent technical expert), reg 26(2), reg 57(8)(c), reg 64(5), reg 104 (Statement of Compliance) and Schedule 4 clause 4
- Department for Infrastructure and Transport, Fact sheet: Engaging an accredited professional as a decision-maker
- PlanSA, Building reforms and the Accredited Professionals Scheme
- PlanSA, Inspections and compliance. Council inspection rates for new houses, commercial buildings and pools
- Engineers Australia, State registration
- YourSAy, Registration of engineers: registration option determined (December 2023)
- Engineers Australia, submission to the NCC review (April 2026). South Australia's registration scheme paused
- Standards Australia, AS 4349.1-2007 Inspection of buildings, Part 1: Pre-purchase inspections, Residential buildings
