In short
In South Australia a retaining wall that retains 1 m or less of ground is not development, so it needs no approval, unless it is within 100 m of the coast, in a flood overlay or on a heritage place. A fence on top counts: wall plus fence over 2.1 m, measured from the low side, needs approval. Cost disputes between neighbours go to the Magistrates Court.
Key takeaways
- Up to 1 m retained: not development (PDI Regulations, Schedule 4 clause 4(1)(f)). Tiered walls are measured on the overall difference.
- No exemption within 100 m of the coast, in a flood zone, subzone or overlay, or on a local or State heritage place.
- Wall plus fence over 2.1 m from the low side needs approval, and councils such as Salisbury ask for the engineer's footing calculations.
- Digging or filling near a boundary can trigger a section 139 notice, served at least 20 business days before work starts.
- Each owner retains the ground they, or a previous owner, changed. Disputes go to the Magistrates Court (Minor Civil), not the council.
Retaining walls cause more neighbour arguments than almost any other small structure, and the rules in South Australia are spread across regulations, council pages and case law. This guide pulls them together: when a wall needs approval, how a fence on top changes the answer, what happens when someone digs near a boundary, and who pays when a wall between two blocks fails.
Retaining wall rules in SA: quick facts
- No approval
- Retains 1 m or less (overall, for tiered walls)
- Always approval
- Within 100 m of the coast, flood overlays, heritage places
- Wall plus fence
- Over 2.1 m from the low side needs approval
- Section 139 notice
- At least 20 business days before digging or filling
- Disputes
- Magistrates Court (Minor Civil), not council
- Our design
- From $790 + GST ($869 inc GST)
When does a retaining wall need approval in SA?
A retaining wall needs approval when it retains a difference in ground levels of more than 1 m, or when it sits somewhere the exemption doesn't apply. Under Schedule 4 clause 4(1)(f) of the General Regulations, a wall retaining 1 m or less is not development. The exemption is lost:
- In a designated flood zone, subzone or overlay in the Planning and Design Code
- Within 100 m of the coast, measured from the mean high water mark at spring tide
- On a local heritage place or a State heritage place
Tiered walls are measured on the overall difference in level, so two 700 mm walls stepping up a slope count as 1.4 m. Building a wall on an SA Water easement, or filling or excavating there, also needs SA Water's approval, applied for at the same time as council.
Does the wall retain more than 1 m, counting all tiers?
Measure the difference between the ground levels on each side.
Yes: development approval and an engineer's designNo: go to the next questionIs it within 100 m of the coast, in a flood overlay or on a heritage place?
Check the zone and overlays for your site in the Code.
Yes: approval needed, even under 1 mNo: go to the next questionWill a fence on top take the total over 2.1 m from the low side?
Measure from the lower finished ground level.
Yes: approval, with footing calculationsNo: go to the next questionWill you dig or fill near the boundary?
The section 139 triggers are explained below.
Yes: serve a Form 1 notice at least 20 business days aheadNo: usually no approval; a design is still wise
Does a fence on top of a retaining wall need approval?
Yes, once the wall and the fence together stand more than 2.1 m high, measured from the low side. A fence on its own is exempt up to 2.1 m, measured from the lower of the two finished ground levels, but a wall lifts the fence. The City of Salisbury asks for "engineer's design documentation including calculations for the footings and connection details" for these combinations.
| Situation | Approval? | Rule |
|---|---|---|
| Wall retaining 1 m or less, outside the excluded areas | No | Schedule 4 cl 4(1)(f) |
| Wall retaining more than 1 m (tiers measured overall) | Yes | Schedule 4 cl 4(1)(f) |
| Any wall within 100 m of the coast, in a flood overlay or on a heritage place | Yes | Schedule 4 cl 4(1)(f) |
| Fence up to 2.1 m from the lower ground level | No, with exceptions | Schedule 4 cl 4(1)(d) |
| Masonry fence over 1 m, or any pool safety fence | Yes | Schedule 4 cl 4(1)(d) |
| Wall plus fence over 2.1 m from the low side | Yes | Law Handbook; council guidance |
| Wall, fill or excavation on an SA Water easement | SA Water approval | SA Water encroachment rules |
PDI (General) Regulations 2017, version of 29.10.2026. Other fence exceptions include Historic Area front fences, fences over 1 m within 6 m of a corner and some landscape overlays. Confirm with your council or certifier.
When do you need an engineer for a retaining wall?
You need an engineer's design for any wall that needs approval, and it is worth having one for lower walls that carry real load. Exempt only means no approval: a 900 mm wall holding up a driveway, a house footing or a neighbour's fence still has to stand up for decades.

- Near a building: the wall's footing and the house footing affect each other
- Under a driveway or parking area: vehicle loads push harder on the wall
- Beside a pool: see pool engineering
- On reactive clay: much of Adelaide sits on highly reactive clay, and wet clay pushes hard. Read reactive clay soils
- Where water collects: drainage behind the wall is part of the design. Read stormwater rules in Adelaide
Our retaining wall engineering starts from $790 + GST ($869 inc GST) and gives your builder or landscaper drawings to price and build from, and your council or certifier what they need to assess.
What does a retaining wall application need to show?
A building consent application for a retaining wall must show its location, its minimum and maximum heights, elevations at 1:200 and its materials (Schedule 8 clause 2(1)(h)). The site plan at 1:500 also shows easements and trees, including "the location of any regulated tree on the site or on adjoining land". The engineer adds the calculations, the footing and the drainage. Read building approvals in SA for the whole process.
What if you dig or fill near the boundary?
Excavation or fill near a boundary can trigger section 139 of the PDI Act, which protects the stability of the neighbour's land and buildings. The triggers in reg 64 are:
- Excavation that cuts a 1 vertical : 2 horizontal plane taken from 600 mm below natural ground at the boundary
- Fill within 600 mm of the boundary, unless it is 200 mm or less and for landscaping
Does the excavation trigger a section 139 notice?
The building owner must serve an initial notice on Form 1 (Schedule 10A) at least 20 business days before work starts. The neighbour may then have a professional engineer specify shoring or underpinning, and the building owner pays the reasonable cost of that report and plans. The penalty for not complying is up to $10,000. A dilapidation report before work starts records the neighbour's house as it was. Read your neighbour is digging next door for the neighbour's side.
Who pays for a retaining wall between neighbours in SA?
Each owner pays to retain the ground that they, or a previous owner, changed from its natural level. The Law Handbook sets out how this works:
- One owner changed the levels: that owner retains the earth and pays for the wall
- Both changed them: the cost is shared in proportion, so 300 mm of fill on one side against 700 mm of cut on the other splits 30/70
- Someone fills or digs next to an existing wall: they pay for the extra support it needs
- Footings stay on your side: they must not cross the boundary unless both owners agree (Encroachments Act 1944)
Sharing the cost of a shared retaining wall
A retaining wall is not a fence for the purposes of the Fences Act 1975: the Law Handbook says it "is not considered to be a fence and is covered by different laws". Fence notices and fence cost-sharing don't decide who pays for the wall underneath.
Where do retaining wall disputes go in SA?
To the Magistrates Court (Minor Civil Division). Councils don't apportion retaining wall costs between neighbours. Before it gets that far, an independent engineer's report helps both owners: it records the natural ground level where it can be worked out, the condition of the wall, the likely cause of any failure and the work needed. We report on the structure only and take no side in the dispute beyond the facts.
When to call a structural engineer
Call an engineer before the wall is built, or as soon as an existing one starts to move.
- The wall will retain more than 1 m, counting all tiers, or sits near the coast or a flood overlay
- A fence on top will take the total over 2.1 m from the low side
- You'll dig or fill near a boundary, or your neighbour has served you a section 139 notice
- An existing wall is leaning, cracking or bulging, or water seeps through it
- You and a neighbour disagree about who should pay
A design your builder and certifier can use
Send a photo of the slope, the height you need and what sits above and below. Our retaining wall engineering starts from $790 + GST ($869 inc GST), with a fixed quote in under 20 minutes on average, during business hours. Get a fixed quote.
Need an engineer?
Planning a retaining wall?
Send a photo of the slope and the height you need. You'll have a fixed quote for the design in under 20 minutes on average, during business hours.
Sources
- Planning, Development and Infrastructure (General) Regulations 2017 (SA), version of 29.10.2026. Schedule 4 clause 4(1)(d) and (f), reg 3C, reg 64, Schedule 8 clause 2(1)(h), Schedule 10A
- Legal Services Commission of SA, Law Handbook: retaining walls, fences and neighbour excavation. Wall-plus-fence rule, tiered walls, who is responsible, section 139 and disputes
- City of Salisbury, Fencing
- SA Water, Encroachment over an easement (fact sheet)