Dilapidation reports before work starts next door
A dilapidation report is a dated record of a building's condition before nearby excavation, demolition or construction begins. We photograph and measure every crack and defect, so any new damage can be told apart from what was already there.
- From $690+ GST ($759 inc GST)
- Under 20 minaverage time to a fixed quote
- 20 business daysminimum s139 notice before excavation
In short
A dilapidation report in Adelaide starts from $690 + GST ($759 inc GST). It records a building's condition, with dated photos and a measured crack register, before work starts next door. In South Australia, excavation or fill near a boundary can trigger a section 139 notice at least 20 business days ahead, and the neighbour may have their own engineer specify protection work.
- Fee
- From $690 + GST ($759 inc GST)
- You receive
- Dated photos, a crack register and a report
- When
- Before excavation, demolition, piling or building next door
When you need one
When do you need a dilapidation report in Adelaide?
You need one before any work next door that could move the ground under a building or shake it: excavation, demolition, piling or a new build on the boundary. The report has to be done before the work starts, because it can't be done afterwards.
Excavation next door
Basements, pools, cut for a level slab or a new retaining wall. The deeper and closer to the boundary, the more it matters.
Demolition
Taking down a house or a shared wall can crack the building beside it, especially old masonry built hard on the boundary.
Piling and compaction
Driven piles, rollers and heavy plant send vibration through the ground to nearby footings and brittle plaster.
Before your own build
If you are the one building, a report on each neighbour's house protects you against claims for cracks that were already there.
Major works in the street
Large projects, trenching or heavy traffic beside an older house are worth recording first.
Section 139: the rules in South Australia
Under section 139 of the PDI Act and regulation 64, excavation that cuts a plane at 1 vertical to 2 horizontal from 600 mm below natural ground at the boundary, or fill within 600 mm of it (other than landscaping fill of 200 mm or less), needs a Form 1 notice to the neighbour at least 20 business days before work starts. The neighbour may have a professional engineer specify shoring or underpinning, and the building owner pays the reasonable cost of that report and plans. The penalty for not complying is up to $10,000.
A section 139 notice and a dilapidation report do different jobs. The notice starts the process of protecting the neighbour's building. The report records what the building looks like before anything happens, so a later claim turns on measurements rather than memory. Figure 1 shows the section 139 trigger plane. Whether the work actually moves the neighbour's footings is a separate engineering question, and a dated record of their condition is what settles it later.
Records matter most for old buildings. In April 2026 a City of Adelaide panel considered a demolition application for an 1851 Local Heritage Place after cracking allegedly caused by neighbouring construction, with an engineering report saying it was not structurally safe to live in. Our guide to neighbour excavation in SA explains your rights on both sides of the fence.
Does the excavation trigger a section 139 notice?
What you receive
What's in an engineer's dilapidation report?
A dated record that someone else can check years later: what was there, where, how big, and the photo that proves it.
- Every room, the exterior, paving, fences and retaining walls, as access allows
- A crack register with location, width, length and a photo reference for each crack
- Dated photos of each elevation and each defect, with a scale where it helps
- Doors and windows that stick, out-of-level floors and existing damp
- The construction type: bluestone, brick, brick veneer or framed, and the footing type where visible
- The date and conditions of the inspection
| Item | Location | Element | Observation | Width | Length | Photo |
|---|---|---|---|---|---|---|
| 1 | East wall, outside | Bluestone | Crack through lime mortar beside quoin | 1.5 mm | 900 mm | 12 |
| 2 | Bedroom 2, east wall | Plaster | Fine crack from window corner | <0.1 mm | 350 mm | 21 |
| 3 | Hallway | Ceiling | Cornice joint open | 0.5 mm | 1.2 m | 27 |
| 4 | Side path | Concrete | Shrinkage crack, no step | 0.5 mm | 2.0 m | 33 |
Before and after
How do before-and-after dilapidation reports work?
The first report records the building before work starts. A second inspection after the work, or at a stage you agree, compares each item with the first report and records anything new.
- Step 1
Send the details
The address, what is planned next door and the start date. Builders can send one request for several neighbours.
- Under 20 min on average
Get a fixed quote
During business hours, for the first report and, if you want it, the follow-up.
- Before work starts
First inspection and report
Dated photos, measurements and the crack register.
- During the work, if needed
Monitoring
Crack monitors or level readings on the cracks that matter most.
- After the work
Follow-up comparison
Each item checked against the first report, with any new or wider cracks recorded.
Dilapidation report
- A house inspected inside and out, with a report
- A fixed quote in under 20 minutes on average, during business hours
- Follow-up reports and several properties quoted together
Photos on their own
- No measurements to compare later
- No view on whether new damage is structural
An independent engineer's report
- A measured, dated crack register
- Says whether new damage is structural, and why
Which report?
Dilapidation report, structural inspection or defect report?
A dilapidation report records condition at a moment in time. The other two diagnose a problem.
| Report | Dilapidation report | Structural inspection | Building defect report |
|---|---|---|---|
| The question | What is the condition now, before nearby work? | What is wrong, why, and what should be done? | Is new or recent building work defective? |
| When | Before excavation, demolition or building next door, then after | When you see cracks or movement | When defects appear in new or recent work |
| Result | A dated record with a crack register | Diagnosis and recommendations | A defect register measured against drawings and standards |
| Price | From $690 + GST ($759 inc GST) | From $990 + GST ($1,089 inc GST) | Fixed quote per job |
| Page | This page | Structural inspection | Building defect reports |
Where we work
Where do you do dilapidation reports?
Across Greater Adelaide and the Adelaide Hills, wherever new building meets old: infill in North Adelaide and Unley, cottages beside new townhouses in Woodville and Bowden, and stone villas in Norwood and Burnside. A dilapidation report needs a site visit, so it isn't a desktop service. See all areas.
We are engineering only. We don't do the excavation, the shoring or any repair, so the record we make is the same whichever side of the fence ordered it. Builders with several neighbours can use the full quote form and list every address.
Related services
Often needed alongside a dilapidation report

Structural inspection & report
An engineer's report on what's wrong with the structure, why it's happening and what to do next, for any Adelaide home.
from$990+ GST$1,089 inc GSTLearn more
Underpinning: independent assessment
An independent engineer checks whether the underpinning or resin injection you've been quoted is needed, then designs it if it is. We never sell or carry out underpinning.
from$350+ GST$385 inc GSTLearn more
Cracks & footing movement
Cracks measured and mapped, the cause found in the ground, the water or the building, and the repair priority set before anyone quotes for underpinning.
from$990+ GST$1,089 inc GSTLearn moreWhat is a dilapidation report?
A dated record of a building's condition, made before nearby work starts. It lists existing cracks and defects with photos and measurements, so later damage can be compared with what was there before.
Who pays for a dilapidation report?
Whoever orders it. Builders and developers often commission one for each neighbouring property, and a neighbour can commission their own. Separately, under section 139 the building owner pays the reasonable cost of the neighbour's engineer's report and plans for protection work.
What is a section 139 notice?
The notice a building owner must serve on a neighbour, on Form 1, at least 20 business days before excavation or fill that could affect the neighbour's land. The neighbour can then have a professional engineer specify shoring or underpinning, at the building owner's reasonable cost.
When does excavation next door trigger a section 139 notice?
When the excavation cuts a plane sloping at 1 vertical to 2 horizontal from 600 mm below natural ground at the boundary, or when fill is placed within 600 mm of the boundary, unless it is 200 mm or less and for landscaping.
How much does a dilapidation report cost in Adelaide?
Ours start from $690 + GST ($759 inc GST) for a house. Size, access, the number of properties and a follow-up report after the works change the fee, and you get a fixed quote in under 20 minutes on average, during business hours.
Do I need a report after the work as well?
It's what makes the first report useful. A follow-up inspection after the excavation or construction compares the building with the first report and records anything that has changed.
Who can prepare a dilapidation report?
Building inspectors and engineers both prepare them. An engineer can also say whether new cracking is structural, what caused it and what protection or repair it needs. For section 139 protection work the regulations ask for a professional engineer: a corporate member of Engineers Australia, or a person on the National Engineering Register, with civil or geotechnical competence.
Does a dilapidation report protect my house?
No. It records condition; it doesn't prevent damage. Protection comes from a well-designed excavation, shoring or underpinning where it's needed, and monitoring while the work is under way.