Steel frame certification and warehouse design

Portal frame warehouses, industrial sheds, canopies and the steelwork inside mixed buildings, designed from the frame down to the footings and slab. We also check and certify steel frames designed by others, for your certifier's file.

  • Fixed quoteper project, before we start
  • Under 20 minaverage time to a fixed quote
  • Documentedfor your certifier
Quote requestMon–Fri 8am–5pm

Get a fixed quote for your steel building

Send the layout or the supplier's drawings, the site address and the building's size and use.

We reply with a fixed quote in under 20 minutes on average, during business hours.

Documented for your certifier
Fixed fee per project
Quotes in under 20 min on average
NCC & Australian Standards

In short

Steel structure design in Adelaide covers portal frame warehouses, sheds, workshops and canopies: the frame, connections, bracing, footings and slab, with wind loads worked out for the site. Steel frame certification is the engineer's check that a frame, including a supplier's light steel house or shed frame, suits its site and loads, or was built as designed. Both are priced by fixed quote.

Fee
Fixed quote per project
Quote
In under 20 min on average, business hours
You receive
Calculations, drawings or a frame certificate

What we design

What steel structures do we design?

We design steel structures for commercial and light industrial use across Greater Adelaide, from a single-bay workshop to a multi-bay warehouse, plus the steelwork inside mixed buildings. Whether you need a warehouse engineer, shed engineering or a portal frame design for a fabricator to price, the order is the same: the site first, then the frame, then the footings.

Portal frame warehouses

Rafters, columns, haunches and knee braces, purlins and girts, and the roof and wall bracing that keeps it all square.

Industrial sheds and workshops

Sheds for storage, trades and vehicles, with large roller door openings designed for the wind pressure they let in.

Light industrial units

Multi-tenancy units with shared frames, internal walls and mezzanine offices. See mezzanine engineering.

Canopies and awnings

Cantilevered canopies, loading dock awnings and covered walkways, where uplift and connections govern the design.

Steel in mixed buildings

Transfer beams, steel posts and portal frames inside masonry or timber buildings, such as an open-plan ground floor.

Extensions and alterations

New bays, new openings and added loads on existing frames, checked against what the old frame can carry.

Steel frame certification

What does steel frame certification cover?

Steel frame certification covers either the design (does this frame suit this site and these loads?) or the build (was the frame put up as designed?). A consent can list a frame certificate among the documents to supply at completion, so check yours.

FrameWhat we checkYou receive
Supplier's light steel house or granny flat frameWind for the site, tie-down, bracing, beam and lintel sizes against the plansDesign check and certificate
Kit shed, carport or verandahThe kit's design inputs against your site, openings and footingsSite check, footing design and certificate
Fabricator's portal frameMember sizes, connections and base plates against the loadsDesign check or shop drawing review
Frame as builtInspection against the approved drawings: members, bracing, fixings and hold-downsInspection certificate for the completion paperwork
Light steel wall frame standing on a new concrete slab in a suburban backyard, with a brick house and Colorbond fence behind
Figure 1A light steel frame on a new slab. A supplier's frame design still needs checking against the site's wind and tie-down.

Light steel frames are designed to AS/NZS 4600 and the NASH Standard; hot-rolled steel to AS 4100. A certificate for a single home is covered on our engineer's certificates page. The builder signs Part A of the Statement of Compliance and the owner Part B; our certificate goes with it where the consent lists one.

Loads

How are wind and earthquake loads worked out for a steel building?

Wind loads are worked out for the specific site under AS/NZS 1170.2, and earthquake loads under AS 1170.4. For a light steel building, wind usually governs the frame, the bracing and the footings, so the site factors below matter more than the steel grade.

FactorWhat it meansWhy it varies across Adelaide
TerrainHow rough the ground is upwindOpen coast, the Port River flats and open paddocks on the fringe see higher winds than built-up suburbs
ShieldingProtection from nearby buildingsAn infill site may be shielded; a building alone or at an estate edge is not
TopographySpeed-up over hills, ridges and escarpmentsSites on the Hills face and Adelaide Hills crests take higher wind than the plains
Height and importanceThe building's height and its importance level under the NCCTaller buildings and higher importance levels take larger design loads
OpeningsInternal pressure through large openingsA roller door open in a storm can pressurise the whole building from inside
EarthquakeSideways load from ground shakingAdelaide's earthquake hazard is the highest of the capital cities and is part of our design checks

Changing a building changes its loads

Adding a large roller door, removing wall cladding, adding a mezzanine or extending the building changes the internal pressure and the bracing loads. Have the frame checked before the change, not after.

The design package

What's in a steel structure design package?

A steel structure design package gives the fabricator, the builder and the certifier what they need to price, build and approve the frame. Your quote lists the items for your project.

  • General arrangement drawings with member sizes, grades and the column grid
  • Connection details: base plates, haunches, apex, purlin cleats and bracing
  • Roof and wall bracing layout, including fly bracing to rafters and columns
  • Pad footings and hold-down bolts designed for uplift and sideways loads
  • Slab thickness, joints and reinforcement for floor loads, racking and forklifts
  • Calculations to AS/NZS 1170 for loads and AS 4100 for structural steel
  • Shop drawing review and stage inspections, where your quote includes them

Kit shed or custom design?

CompareKit shedCustom steel design
Frame designSupplier's standard design for a set of wind and size inputsDesigned for your building, site and use
Footings and slabSometimes standard, sometimes left to youDesigned from the site classification
ChangesExtra openings, mezzanines or cladding changes need checkingIncluded in the design from the start
Where we helpChecking the kit for your site, designing the footings, certifying the frameThe full design, documents and inspections

Your certifier tells you whether a kit's engineering is enough for your site or whether site-specific checks are needed too.

Ground and water

What else does a warehouse site in Adelaide need?

A warehouse site needs footings designed for the ground, drainage for a large roof, and checks for coastal and boundary conditions. These often decide the cost as much as the steel does.

01

Slabs on reactive clay

Much of Adelaide sits on highly reactive clay, and every site needs its own classification. A warehouse slab is designed from a site investigation for its floor loads and traffic.

02

Water from a big roof

Street and kerb connections need council approval, and work on an SA Water easement needs SA Water's approval. See stormwater and drainage plans.

03

Coastal and low-lying land

Near the coast and the Port, steel coatings are chosen for the site's corrosion exposure, and the Code's Hazards (Acid Sulfate Soils) Overlay can control excavation.

04

Boundaries

Footings dug near a boundary can trigger a section 139 notice to the neighbour at least 20 business days before work starts. See dilapidation reports.

Planning a steel building?

Send the layout for a fixed quote

Concept drawings, a supplier's drawings or a sketch with the size, use and address are enough. You'll have a fixed fee in under 20 minutes on average, during business hours.

FAQ

Steel structure and warehouse FAQs

Still unsure? Call 08 7083 9853 or send photos for a fixed quote.

What is steel frame certification?

It's an engineer's check that a steel frame suits its site and loads, or that the frame as built matches the approved design. A certifier can ask for one for a supplier-designed house, shed or carport frame, or for a portal frame detailed by a fabricator.

Does a shed or warehouse need approval in SA?

A warehouse does. Small outbuildings are exempt only within set limits (up to 15 m² floor area, a 3 m roof span and 2.5 m high, plus other conditions). Anything bigger needs Development Approval on PlanSA, with Building Rules Consent from the council or an accredited professional.

Which certifier can approve a warehouse?

A Building Level 1 accredited professional or the council can approve any size. A Building Level 2 accredited professional can approve buildings up to 3 storeys and 2,000 m², but only once the structural calculations are certified by an independent technical expert.

Can you check a kit shed for my site?

Yes. We check the supplier's design against your site's wind, the soil and any changes such as extra openings, a mezzanine or different cladding, and design the footings and slab where the kit doesn't include them.

What wind and earthquake loads apply in Adelaide?

Wind is worked out for each site under AS/NZS 1170.2 from its terrain, shielding, topography and height, so two sites in one suburb can differ. Adelaide's earthquake hazard is the highest of the capital cities and is part of our design checks.

Do you design the slab and footings as well as the frame?

Yes. Pad footings and hold-down bolts are designed for the frame's uplift and sideways loads, and the slab for its floor loads, racking and forklifts, from a site classification or geotechnical investigation.

How much does steel structure design cost?

Steel buildings and frame certification are priced by fixed quote per project, based on size, the number of frame types, the site and the inspections needed. You'll have the fixed fee in under 20 minutes on average, during business hours.

Do you supply or build steel buildings?

No. We are engineering only. We design and certify the structure, and any fabricator and licensed builder can price and build it.