Granny flat engineering, from soil test to slab

A granny flat is a small house in your backyard, and it needs the same engineering: a site classification, a slab or footings designed for your clay, and a frame tied down against wind. We do the engineering; your builder or kit supplier builds it.

  • Fixed quoteper job, before we start
  • Under 20 minaverage time to a fixed quote
  • 70 m²granny flat floor area in the Code's DTS criteria
Quote requestMon–Fri 8am–5pm

Get a fixed quote for your granny flat

Send the floor plan or the kit supplier's drawings, the address and a photo of where it will go.

We reply with a fixed quote in under 20 minutes on average, during business hours.

Engineering only
Fixed quote per job
Quotes in under 20 min on average
NCC & Australian Standards

In short

Granny flat engineering in Adelaide covers the soil test and site classification, the slab or footing design, and the frame and tie-down. The Planning and Design Code's deemed-to-satisfy criteria allow ancillary accommodation of up to 70 m² floor area with walls up to 3 m high, depending on your zone. Much of Adelaide sits on highly reactive clay; every site needs its own classification.

Fee
Fixed quote per job, agreed before we start
Starts with
A site classification for the exact spot
You receive
Slab or footing design, frame tie-down, drawings and calculations

What's involved

What engineering does a granny flat need?

A granny flat needs a site classification, a slab or footing design for that class, and a frame that is braced and tied down from the roof to the slab. On a sloping block or near trees, a sewer or a boundary, the design deals with those too.

Soil test and site class

Boreholes where the granny flat will stand, classified to AS 2870. We arrange it.

Slab or footings

A stiffened raft or waffle slab, or footings on piers, sized for the site class and the frame.

Frame and tie-down

Steel or timber frame checks, bracing and hold-downs that stop the roof lifting in wind.

Cut, fill and retaining

Level platforms on sloping blocks, and engineered retaining walls where the cut or fill is high.

Drainage

Roof water and surface water kept away from the slab edge, with a drainage plan if your certifier wants one.

Drawings and certificates

Drawings and calculations for Building Rules Consent, and inspections or certificates where the consent lists them.

Order the soil test early

The slab design can't be finished without the site class, and the site class can't be done until the granny flat's position is settled. Peg out the corners, then book the soil test before you sign the building contract.

South Australian rules

What are the granny flat rules in SA?

In the Planning and Design Code a granny flat is ancillary accommodation: a second, smaller dwelling that belongs to the main house on the same site. The Code's deemed-to-satisfy criteria (DTS/DPF 19.4 in Design in Urban Areas) set its size.

RuleDeemed-to-satisfy limit
Relationship to the houseAncillary to a dwelling on the same site
Floor areaNot more than 70 m²
Wall heightUp to 3 m
Roof heightUp to 5 m
ApprovalPlanning Consent and Building Rules Consent, lodged on PlanSA

Planning and Design Code, Design in Urban Areas, DTS/DPF 19.4 (Code version 2026.19). The Code is updated about every fortnight; check the online Code for your zone before you design.

Check your zone first

Zones differ, and whether a granny flat may be fully self-contained or must share services and open space with the house depends on the current Code wording for your site. Your designer or a planner confirms this at Planning Consent, before the engineering is finished.

Once it's approved and built, a granny flat follows the same completion steps as a house: your builder gives the council notice at the required stages, and at the end signs Part A of the Statement of Compliance while you sign Part B. If the building work costs $20,000 or more, the builder also needs building indemnity insurance.

Our granny flat rules in SA guide covers the planning side in more detail.

Slabs and footings

Which slab suits a granny flat on reactive clay?

The slab that suits your granny flat depends on its site class: the more the clay can shrink and swell, the deeper and stiffer the slab beams need to be. Much of Adelaide sits on highly reactive clay, and every site needs its own classification, even when the main house already has one, because the granny flat sits on a different patch of ground.

Site classTypical approach for a granny flat
A, SA lighter stiffened raft or waffle slab
MA stiffened raft or waffle slab with deeper beams
H1, H2Deeper, stiffer beams and careful drainage around the edge
EA very stiff slab, or footings on piers to more stable ground
PDesigned for the problem: fill, trees, a removed tree or a leak

AS 2870 site classes. Slab notes are general engineering practice; your design follows the class and conditions on your site.

Two Adelaide details often change the design. A granny flat close to the main house can disturb or load its footings, so the gap and the drainage between them matter. And a slab on clay that's been dried out by a tree, or wetted by a leaking pipe, is a Class P problem until the cause is dealt with. See site classification and footings for how the classes work.

Printed footing plan and steel beam plan drawings with footing details, a scale ruler, a pen and a signed certificate on a timber desk
Figure 1A footing plan with edge and internal beam details: the slab design your builder prices and your certifier checks.

Key takeaways

  • Up to 70 m² and 3 m walls under the deemed-to-satisfy criteria; check your zone.
  • The granny flat needs its own site class, not the house's.
  • Kits often come with frame engineering; the slab still has to suit your ground.
  • Sewer easements need SA Water's approval before you build near them.

Your block

What on your block can change the design?

Trees, sewers, slopes and boundaries change a granny flat design more often than the building itself. These are the ones we check on Adelaide blocks.

Trees

Roots dry reactive clay. Regulated trees on your land or next door are shown on the consent site plan, and the 3 m exemption never covers eucalypts, Corymbia, Angophora or willow myrtle.

Sewer and water easements

SA Water's approval is needed to build over an easement, with clearances such as 1.5 m to the centre of a wastewater main. Nothing is built over water easements or sewer access points.

Digging near a boundary

Deep cuts close to a neighbour's land can trigger a section 139 notice at least 20 business days before work. See neighbour excavation.

Sloping blocks

A level platform means cut, fill or both. Fill under a slab must be controlled, or the site becomes Class P.

Adelaide Hills

All land in the Adelaide Hills Council area must meet bushfire construction requirements. See our Adelaide Hills page.

Next to the house

A slab close to the main house is designed so neither building's footings are undermined or loaded by the other.

We engineer granny flats across Greater Adelaide and the Adelaide Hills, from Salisbury and Elizabeth in the north to Morphett Vale in the south. The approach is the same everywhere: the site class decides the slab.

How it works

How does granny flat engineering work?

It runs from your plan to drawings ready for consent in four steps, with the price fixed before anything starts.

  1. Step 1

    Send the plan and the address

    The floor plan or the kit supplier's drawings, and a photo of the spot, through the form on this page or the quote page.

  2. Under 20 min on average

    Get a fixed quote

    It covers the site classification, the slab or footing design and the frame and tie-down checks.

  3. Before design

    Soil test arranged

    Boreholes where the granny flat will stand, and an AS 2870 site class.

  4. On the date in your quote

    Drawings and calculations

    Ready for your builder to price and for Building Rules Consent.

Fixed quote per job

Granny flat engineering

Priced for your plan and your block, and fixed before anything starts.

  • Site classification arranged
  • Slab or footing design to AS 2870
  • Frame bracing and tie-down checked
  • Drawings and calculations for consent
  • Desktop design from plans and an existing soil report, anywhere in South Australia
Get a fixed quoteSee all prices

FAQ

Granny flat engineering FAQs

Still unsure? Call 08 7083 9853 or send photos for a fixed quote.

How big can a granny flat be in SA?

Up to 70 m² of floor area under the Code's deemed-to-satisfy criteria (DTS/DPF 19.4), with walls up to 3 m and a roof up to 5 m high, on the same site as the main house. The Code changes regularly and zones differ, so check the current Code for your site.

Does a granny flat need approval in Adelaide?

Yes. A granny flat is development, so it needs Planning Consent and Building Rules Consent, lodged through PlanSA. Our slab, footing and frame engineering goes with the building consent application.

Do I need a soil test for a granny flat?

Yes, in practice. The building consent application needs details of the foundation investigation, and the slab design depends on the site class. Much of Adelaide sits on highly reactive clay; every site needs its own classification.

How much does granny flat engineering cost?

Granny flats are priced by fixed quote per job, because the size, the frame, the slope and the soil differ on every block. Send the plan and address for a fixed quote in under 20 minutes on average, during business hours.

My granny flat is a kit. Do I still need an engineer?

Usually for the slab or footings at least. Kit suppliers often provide frame engineering, but the slab under it has to suit your site class and any trees, slope or fill. We design the slab to match the kit's frame and hold-down details.

Can a granny flat go over a sewer easement?

Only with SA Water's approval, applied for at the same time as the council application. Its encroachment rules set clearances such as 1.5 m to the centre of a wastewater main, and nothing is built over water easements. Check SA Water's current rules for your block.

What about a granny flat in the Adelaide Hills?

All land in the Adelaide Hills Council area must meet bushfire construction requirements, and sloping blocks often need cut, fill or a retaining wall. We design the footings and any retaining walls; your designer and builder handle the bushfire requirements.

Do you build granny flats?

No. We are engineering only. Any builder or kit supplier can build from our design, and we never recommend one.